Activity

Recorded research reviews across data centres and land.

Demand & infrastructure signals
234 matching entries

A review is a research check, not a new project announcement. Open a record for its source evidence.

One Podgorica data centreOperating

Podgorica, Montenegro

Operating carrier-neutral facility at Josipa Broza Tita bb, Podgorica. The operator documents dual grid feeds and on-site interconnection; contracted import MW/MVA, land title and physically diverse fibre routes remain unverified. Market intelligence only.

Review context

Operating carrier-neutral facility at Josipa Broza Tita bb, Podgorica. The operator documents dual grid feeds and on-site interconnection; contracted import MW/MVA, land title and physically diverse fibre routes remain unverified. Market intelligence only.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Prilep Business Continuity and Disaster Recovery Data CentreOperating

Prilep, North Macedonia

Government disaster-recovery facility at Karatash near the Mirche Acev barracks. Municipality evidence identifies its construction permission and selected works contractor; operational backup use is documented historically. The Ministry of Interior is the beneficiary, not automatically the verified operator or landowner. Not a commercial land opportunity.

Review context

Government disaster-recovery facility at Karatash near the Mirche Acev barracks. Municipality evidence identifies its construction permission and selected works contractor; operational backup use is documented historically. The Ministry of Interior is the beneficiary, not automatically the verified operator or landowner. Not a commercial land opportunity.

Latest dated source: 30 Mar 2018. This is a source publication date, not the review or construction date.

Open full evidence
Pure DC LON01B2 — Brent Cross expansionUnder construction

Brent Cross, North London, United Kingdom

B2 expansion within an operating campus. Glencar has the West Cold Shell package; Mace is recorded for an earlier construction phase, not assumed to hold the new award. Existing B1 and the combined 90 MW campus are not counted as additional projects.

Review context

B2 expansion within an operating campus. Glencar has the West Cold Shell package; Mace is recorded for an earlier construction phase, not assumed to hold the new award. Existing B1 and the combined 90 MW campus are not counted as additional projects.

Latest dated source: 3 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
RASH — Tirana Data CenterOperating

Tirana, Albania

Operating Tirana academic data centre hosting ANIX and serving university services. RASH documents a facility dating from 2016 and GÉANT connectivity; current import capacity and commercial dark-fibre rights remain unverified.

Review context

Operating Tirana academic data centre hosting ANIX and serving university services. RASH documents a facility dating from 2016 and GÉANT connectivity; current import capacity and commercial dark-fibre rights remain unverified.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
RDM Barcelona Cartonboard — closed mill footprintWatching

Carrer Potassi 7, P.I. Àrea del Llobregat / ACISA, 08755 Castellbisbal, Barcelona; ETRS89 UTM 412940 / 4590634, Spain

New regulatory milestone on a historical closure: on 17 September 2026, DOGC published the 7 September resolution accepting final cessation of the segregated cartonboard activity. The mill stopped on 27 June 2025. Retain as redevelopment market intelligence because a historical public purchaser process is documented; current outcome remains unresolved.

Review context

New regulatory milestone on a historical closure: on 17 September 2026, DOGC published the 7 September resolution accepting final cessation of the segregated cartonboard activity. The mill stopped on 27 June 2025. Retain as redevelopment market intelligence because a historical public purchaser process is documented; current outcome remains unresolved.

Next check: Obtain the full May and September 2026 permit annexes, cadastral/title plans and the current RDM disposal mandate before testing conditional land control. Reconcile retained energy assets with connection agreements and network-confirmed demand rights; then check the adopted POUM, flood/contamination constraints and diverse fibre routes. No approach has been made.

Open full evidence
Rhodia / Solvay Salindres former fluorochemicals unitsInvestigating

Rue Jean Moulin / Quartier Usine, 30340 Salindres, Gard; regulated establishment AIOT 0006601578, France

Historical closure and redevelopment evidence newly surfaced. DREAL records the final-shutdown notification of 11 March 2025; the 24 February 2026 corporate results confirm closure. The operator's November 2025 committee materials identify investigations of less-constrained areas for possible early release and third-party reuse, alongside retained-platform projects. This is a specific land-release investigation, not an available campus.

Review context

Historical closure and redevelopment evidence newly surfaced. DREAL records the final-shutdown notification of 11 March 2025; the 24 February 2026 corporate results confirm closure. The operator's November 2025 committee materials identify investigations of less-constrained areas for possible early release and third-party reuse, alongside retained-platform projects. This is a specific land-release investigation, not an available campus.

Next check: Retrieve the latest closure/safety and rehabilitation decisions from AIOT 0006601578 and the September 2026 DREAL committee hub. Match the possible early-release areas to cadastral title and the Osmoz/GIE reuse plans, then establish the Rhodia property decision-maker, release authority and any existing mandate before investigating a conditional option. Obtain the GIE supply agreement and upstream network/MIC evidence before testing campus scale. No contact made.

Open full evidence
Rockolo / Gibtelecom Mount PleasantOperating

Gibraltar, Gibraltar

Historical operating facility newly captured at 25 South Barrack Road. Court evidence establishes carrier-access restrictions and operator identity; it is not an available land offer.

Review context

Historical operating facility newly captured at 25 South Barrack Road. Court evidence establishes carrier-access restrictions and operator identity; it is not an available land offer.

Latest dated source: 22 Jul 2024. This is a source publication date, not the review or construction date.

Open full evidence
SAPEC Bay — former Aurora land-acquisition packageInvestigating

Parcela B and industrial lots 43, 45 and 46, Parque Industrial SAPEC Bay, Mitrena peninsula, Setúbal; mapped in EIA 1708/2024, Portugal

Historical cancellation newly researched: Galp decided on 26 November 2024 not to construct Aurora after Northvolt ceased investing and replacement-partner efforts failed. This provides a specific reason to investigate whether the land acquisition package was released. It is not a new 2026 announcement, a confirmed land release or a launched DC project.

Review context

Historical cancellation newly researched: Galp decided on 26 November 2024 not to construct Aurora after Northvolt ceased investing and replacement-partner efforts failed. This provides a specific reason to investigate whether the land acquisition package was released. It is not a new 2026 announcement, a confirmed land release or a launched DC project.

Next check: Reconcile the EIA boundary with current title and the SAPEC–Aurora contract/termination documents, then establish the authorised land-release mandate and any successor commitment. Obtain remediation completion records and a current planning opinion; do not assume lithium approvals transfer to a DC. Validate any surviving E-REDES demand application, route rights and network terms before assigning power scale. No approach has been made.

Open full evidence
SINES Data Campus — SIN01Operating

Sines, Portugal

Operating first Sines building. APA records a conditional 2021 screening outcome for the original 15 MW IT NEST design; the later campus EIA does not automatically settle SIN01's enlarged scope. Current 33 MW IT, inauguration 26 MW and campus 1.2 GW remain distinct.

Review context

Operating first Sines building. APA records a conditional 2021 screening outcome for the original 15 MW IT NEST design; the later campus EIA does not automatically settle SIN01's enlarged scope. Current 33 MW IT, inauguration 26 MW and campus 1.2 GW remain distinct.

Latest dated source: 4 Apr 2025. This is a source publication date, not the review or construction date.

Open full evidence
Smurfit Westrock SSK paper millInvestigating

Mount Street / Heartlands Parkway, Nechells, Birmingham, B7 5RE, United Kingdom

Historical closure decision newly researched. Smurfit Westrock's 29 June 2026 release confirmed the decision and scheduled production cessation for 27 July 2026. That release alone does not verify completed decommissioning or land release.

Review context

Historical closure decision newly researched. Smurfit Westrock's 29 June 2026 release confirmed the decision and scheduled production cessation for 27 July 2026. That release alone does not verify completed decommissioning or land release.

Next check: Reconcile land title, closure completion, retained uses and the group's property decision-maker. Request a scoped land-release proposition, MIC and connection-retention documents only after the ownership/marketing screen. Obtain council case files and environmental closure evidence before a campus test fit.

Open full evidence
Speedcom RuggellOperating

Ruggell, Liechtenstein

Historical Ruggell facility newly captured, formerly associated with Newsnet. Current services evidence is available; planning, title and numeric import capacity remain unresolved.

Review context

Historical Ruggell facility newly captured, formerly associated with Newsnet. Current services evidence is available; planning, title and numeric import capacity remain unresolved.

Latest dated source: 22 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
Tronox Botlek pigment-plant landWatching

Professor Gerbrandyweg 2, 3197 KK Rotterdam-Botlek, harbour 4502; DCMR case 4955682, Netherlands

Historical idling signal newly surfaced. Tronox announced intended idling on 17 March 2025. A South Holland notice of 17 April 2026 records its 14 April application to put the revision permit temporarily in repose (DCMR 4955682). The issuer's 5 August 2026 results still carry Botlek closure charges. These are concrete transition signals, not a declared surplus-land sale or confirmed permanent release.

Review context

Historical idling signal newly surfaced. Tronox announced intended idling on 17 March 2025. A South Holland notice of 17 April 2026 records its 14 April application to put the revision permit temporarily in repose (DCMR 4955682). The issuer's 5 August 2026 results still carry Botlek closure charges. These are concrete transition signals, not a declared surplus-land sale or confirmed permanent release.

Next check: Track the decision and attachments for DCMR 4955682 / request 2026041400499 and reconcile the installation with cadastral title before treating the address as a purchasable parcel. Establish whether the group intends disposal, retained mothballing or another industrial use and identify the authorised property decision-maker. Only after that gate, prepare a conditional purchase/lease proposition and obtain connection-retention and import documents. No contact has been made.

Open full evidence
Turkcell Avrupa Data CentreOperating

Karaağaç OSB, Kapaklı, Tekirdağ (European Turkey), Turkey

Operating facility in Karaağaç industrial zone, on Turkey’s European side. Government opening evidence and a named turnkey contractor identify the campus; power claim is not a verified import right.

Review context

Operating facility in Karaağaç industrial zone, on Turkey’s European side. Government opening evidence and a named turnkey contractor identify the campus; power claim is not a verified import right.

Latest dated source: 13 Sept 2021. This is a source publication date, not the review or construction date.

Open full evidence
Vetropack St-Prex former glassworks — redevelopment estateWatching

Rue de la Verrerie 2a / Rue de la Verrerie, 1162 Saint-Prex, Vaud, Switzerland

Recent owner-led surplus-property evidence following the historical 2024 production closure. Vetropack's H1 2026 report explicitly describes continuing preparation for long-term redevelopment of property no longer required for operations. Its 6 March 2026 notice confirms cullet processing ended in February; the 31 August 2026 update reports furnace dismantling progress and final residual material shipments in mid-August, with some decommissioning still outstanding.

Review context

Recent owner-led surplus-property evidence following the historical 2024 production closure. Vetropack's H1 2026 report explicitly describes continuing preparation for long-term redevelopment of property no longer required for operations. Its 6 March 2026 notice confirms cullet processing ended in February; the 31 August 2026 update reports furnace dismantling progress and final residual material shipments in mid-August, with some decommissioning still outstanding.

Next check: Keep as a land-redevelopment watch, not a qualified opportunity. Match the cadastral former-production footprint to the current hall-letting plans and Vetropack's redevelopment scope. Establish the current property mandate, lease commitments and municipal/cantonal reuse requirements before testing any separately released area. Retrieve closure/remediation and planning files, then seek scoped operator evidence for the actual electrical connection. No approach made.

Open full evidence
VIRTUS LONDON2 — HayesOperating

Hayes, London, United Kingdom

Operational Hayes colocation facility. Operator sources differ on 12.2/12.3 MW IT; 20 MVA incoming supply, cooling/water design and Bouygues/NDY delivery are separately documented.

Review context

Operational Hayes colocation facility. Operator sources differ on 12.2/12.3 MW IT; 20 MVA incoming supply, cooling/water design and Bouygues/NDY delivery are separately documented.

Latest dated source: 25 Apr 2024. This is a source publication date, not the review or construction date.

Open full evidence
VIRTUS Stockley Park campusOperating

Stockley Park, London, United Kingdom

Marketed multi-building campus with distinct phase/property histories. LONDON7's contractor design rating differs from current marketing; filed LONDON7/LONDON14 property interests do not verify one campus-wide freehold owner.

Review context

Marketed multi-building campus with distinct phase/property histories. LONDON7's contractor design rating differs from current marketing; filed LONDON7/LONDON14 property interests do not verify one campus-wide freehold owner.

Latest dated source: 17 Aug 2023. This is a source publication date, not the review or construction date.

Open full evidence
VIVAnet Budapest Data CenterOperating

Budapest, Hungary

Operating Budapest facility at Venyige utca 5. Its Hungarian FAQ makes specific dark-fibre and dual-entry claims, still requiring carrier and route verification. Two 1 MW transformers remain equipment descriptions, not established import or IT capacity.

Review context

Operating Budapest facility at Venyige utca 5. Its Hungarian FAQ makes specific dark-fibre and dual-entry claims, still requiring carrier and route verification. Two 1 MW transformers remain equipment descriptions, not established import or IT capacity.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
VNET DC DigitalisOperating

Bratislava, Slovakia

Operating Slovak carrier-neutral facility; rack density is not multiplied into an unsupported aggregate capacity.

Review context

Operating Slovak carrier-neutral facility; rack density is not multiplied into an unsupported aggregate capacity.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
XTX Markets Kajaani — third buildingUnder construction

Kajaani, Finland

Third building with YIT shell/core and fit-out evidence. A campus-linked 400 kV connection project remains in EIA. The first building’s published 22.5 MW IT is not assigned to this building.

Review context

Third building with YIT shell/core and fit-out evidence. A campus-linked 400 kV connection project remains in EIA. The first building’s published 22.5 MW IT is not assigned to this building.

Latest dated source: 25 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
ArcelorMittal Duisburg upstream unitsWatching

Duisburg, Germany

The company intends to close the steel shop and billet rolling mill after hot-metal supply ends in September 2027, while retaining wire-rod production.

Review context

The company intends to close the steel shop and billet rolling mill after hot-metal supply ends in September 2027, while retaining wire-rod production.

Next check: Look for a separately controllable surplus-land declaration and identify the relevant demand-network operator and rights holder.

Open full evidence
Baiersbronn Frischfaser Karton millWatching

Baiersbronn, Germany

Eurofound records permanent closure in September 2026 after insolvency and an unsuccessful search for investment.

Review context

Eurofound records permanent closure in September 2026 after insolvency and an unsuccessful search for investment.

Next check: Identify the authorised administrator and title holder from public records, then check property-process status and retained electrical rights.

Open full evidence
Ballysimon House / Commons Road landsWatching

South of Old Ballysimon Road, west of Commons Road (L1171), Limerick, Ireland

Newly identified historical landowner signal: MKO’s 6 September 2021 submission LCC-C62-162 sought data-centre zoning for approximately 33.4 ha on behalf of David Fitzgerald and Family. It is a specific landowner-led development ambition, not a newly announced 2026 acquisition or an available powered-land listing.

Review context

Newly identified historical landowner signal: MKO’s 6 September 2021 submission LCC-C62-162 sought data-centre zoning for approximately 33.4 ha on behalf of David Fitzgerald and Family. It is a specific landowner-led development ambition, not a newly announced 2026 acquisition or an available powered-land listing.

Next check: Check the current zoning map and any superseding variation before spending on a connection study. Reconcile the 33.4 ha submission red line with title and retained residential uses. If planning can be advanced, investigate a conditional controlling option and request operator-backed demand feasibility. No contact has been made.

Open full evidence
BD / Becton Dickinson Donore Road plantInvestigating

Donore Road, Drogheda, Co. Louth, Ireland

Fresh closure signal: LMFM reported final production ending on 25 September 2026, with a small decommissioning team remaining. SIPTU’s April 2025 statement independently records the phased closure timetable. Newly researched here on 26 September; this is not a confirmed land sale.

Review context

Fresh closure signal: LMFM reported final production ending on 25 September 2026, with a small decommissioning team remaining. SIPTU’s April 2025 statement independently records the phased closure timetable. Newly researched here on 26 September; this is not a confirmed land sale.

Next check: Prioritise a public parcel/title, planning and retained-use review while decommissioning is underway. Establish the landholding entity, supply point, contracted MIC, network operator and disconnect/retention plan. Prepare a corporate-property option proposition subject to grid and planning diligence for a later authorised approach. No contact has been made.

Open full evidence
Belmont Road residential landsRuled out

Belmont Road, Ferrybank, adjoining the former St Vincent Noviciate building, Ireland

Imported research lead screened against Savills' own brochure and its public listing. This is a marketed residential development property, distinct from the Mullinabro / Ballagh lands.

Review context

Imported research lead screened against Savills' own brochure and its public listing. This is a marketed residential development property, distinct from the Mullinabro / Ballagh lands.

Next check: Keep as an exclusion record to prevent confusion with Mullinabro. Reopen only for a separately evidenced parcel and a materially changed planning, control and power case. No contact has been made.

Open full evidence
Dow Barry — upstream siloxanes footprintInvestigating

Barry Silicone Plant, Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL, United Kingdom

Updated from the 24 September review: Dow’s results dated 23 July 2026 confirm that the upstream siloxanes plant shut during Q2 2026. The wider Barry site remains in operation.

Review context

Updated from the 24 September review: Dow’s results dated 23 July 2026 confirm that the upstream siloxanes plant shut during Q2 2026. The wider Barry site remains in operation.

Next check: Prepare an owner-ready one-page proposal for an option over the redundant unit, then obtain public title/permitting boundaries before an authorised approach to Dow UK site management and corporate real estate. Request a redline of retained operations and a separate land-and-utilities rights schedule. No approach has been made.

Open full evidence
Dow Schkopau — chlor-alkali and vinyl unitWatching

Dow industrial complex, Straße B 13, 06258 Schkopau, Saxony-Anhalt, Germany

Dow’s 7 July 2025 board-approved plan schedules closure of the Schkopau chlor-alkali and vinyl assets for Q4 2027. The wider chemical park remains active.

Review context

Dow’s 7 July 2025 board-approved plan schedules closure of the Schkopau chlor-alkali and vinyl assets for Q4 2027. The wider chemical park remains active.

Next check: Map the exact CAV boundary and supply point using public environmental records; distinguish it from marketed ValuePark plots. Seek a future owner-led release signal before spending on a connection study.

Open full evidence
EPark — DC1, Little IslandRuled out

Little Island, Cork, next to the Dunkettle Interchange, Ireland

New public-project comparator. JCD describes a 100-acre estate and a completed DC1 shell/core. This is an existing developer-led project, not newly originated off-market land.

Review context

New public-project comparator. JCD describes a 100-acre estate and a completed DC1 shell/core. This is an existing developer-led project, not newly originated off-market land.

Next check: Use as a regional delivery and power comparator. Only reopen as an independent development opportunity if a specific controlling transaction and transferable demand rights are documented. No approach has been made.

Open full evidence
FMC / Cheminova Rønland plantWatching

Rønland, Western Jutland, Denmark

Eurofound records a decision to cease production by 31 December 2026. A primary corporate disposal notice was not retrieved.

Review context

Eurofound records a decision to cease production by 31 December 2026. A primary corporate disposal notice was not retrieved.

Next check: Find a primary closure/reuse statement and land boundary; then investigate title, remediation and an operator-backed demand route.

Open full evidence
Former Roche Clarecastle manufacturing siteRuled out

Clarehill, Clarecastle, County Clare, Ireland

Pharmaceutical decommissioning and remediation; owner describes phased release with an initial approximately 20 hectares expected by late 2027.

Review context

Pharmaceutical decommissioning and remediation; owner describes phased release with an initial approximately 20 hectares expected by late 2027.

Next check: Keep in marketed-site comparison/exclusion register and suppress off-market notifications.

Open full evidence
Former UPM Ettringen paper millRuled out

Fabrikstraße 4, Ettringen, Unterallgäu, Germany

Permanent paper-production closure announced 16 December 2025; subsequently brought to market.

Review context

Permanent paper-production closure announced 16 December 2025; subsequently brought to market.

Next check: Retain as a marketed comparable and power-claim validation example; suppress it from off-market alerts.

Open full evidence

This feed combines the latest recorded project and land reviews with saved legacy record notes. It is not a complete field-by-field change history.