Skip to content
Menu

Land research

Potential sites, ownership signals and the evidence needed to progress them.

My shortlist
31 sites

Research is not an offer of land or power. Evidence standard

Watching

IDA Oakfield Business and Technology Park

Oakfield, south-west of Sligo town; Phase 2 enabling-works application area 4.59 ha, within a wider historical 77-acre ground-investigation scope · Ireland

Newly structured bounded land record from older authority evidence, not a new project announcement. Sligo County Council granted conditional permission for Phase 2 access and utility works under 25/60014 on 17 February 2026 after its 15 January decision. IDA then re-tendered the works on 23 July after the first procurement ended without a winner. This establishes an active industrial-land preparation programme, not a data-centre consent or construction start.

Not publishedImport capacity

Next check

Retrieve the full 25/60014 grant and conditions, the NIS mitigation schedule, current Phase 2 drawings and the 2024 ground-investigation results. Reconcile those boundaries with current title, IDA allocation/marketing terms and adopted zoning. After that, request evidence of a plot-specific ESB Networks demand route and carrier entries; do not infer capacity from Srananagh or the MAN. Monitor eTenders resource 8706179 after its indicated late-October award fields. No contact made.

Watching

IDA Belview — Kilmurry and Gorteens landbank

Kilmurry and Gorteens, north of IDA Science and Technology Business Park, Belview / Slieverue, South Kilkenny · Ireland

Weekly authority recheck of the existing landbank lead: the live ACP file still shows only the 18 June 2026 lodgement and no decision. The application contains an NIS, flood assessment, access/service drawings and statutory ecology objections. This is enabling-infrastructure evidence, not an announced data centre or land release.

Not publishedImport capacity

Next check

Monitor ACP-324383-26 for the Commission's decision and any further ecology material. Confirm whether the requested otter, bat-roost and lighting assessments were completed and accepted. Retrieve an executed access/right-of-way instrument, current title/allocation terms and a current Uisce Éireann agreement. Then match parcel boundaries to zoning, power and carrier entries. Review CfT 8646533 only after retrieving current status; no award is claimed. No contact made.

Watching

IDA Quignashee — Sligo Road industrial holding

Quignashee, Sligo Road / N59, Ballina, County Mayo; named IDA holding, current title boundary unverified · Ireland

Named entity: IDA Ireland (December 2021 parliamentary ownership statement; current registered title unverified)

Newly researched enabling-infrastructure evidence for a specific industrial holding. IDA's eTenders workspace records Ballina road-infrastructure design services published on 11 February 2026 and an award entry on 30 June 2026 for €185,815. Western People's 24 April 2026 report connects the current access/masterplanning initiative to the Sligo Road holding. The primary procurement page names Ballina, so the exact works boundary still needs reconciliation. This is industrial-land preparation, not a data-centre appointment or construction start.

Not publishedImport capacity

Next check

Obtain the boundary drawings and current planning package behind eTenders CfT 7487743 / TED 452399-2026; match them to Quignashee title and distinguish it from the existing Bunree industrial estate. Establish the current IDA allocation/marketing position and N59/TII access resolution. Then obtain parcel-specific import and fibre-route evidence before considering capacity, score or qualification. No contact made.

Watching

Mullinabro lands — Ballagh Holdings

Mullinabro, Ferrybank / South Kilkenny, northern edge of Waterford urban area · Ireland

Owner-led land and zoning signal. Kilkenny’s December 2025 report records Ballagh Holdings’ Mullinabro masterplan and data-centre utility assessments (KK-C330-65). Variation 6 was adopted on 23 March 2026. This lead was identified following a user tip, then corroborated with public records.

Not publishedImport capacity

Next check

Match consultant-cited folios KK11641 and KK37926F to current title, the adopted zoning and campus boundary. Establish Ballagh’s exact legal identity and Echelon relationship, then obtain current operator feasibility and application evidence before assigning MVA or preparing controlling terms. Check the separate Great Island–Belview development permission and delivery status; maritime consent alone does not authorise construction. No contact or purchase has been made.

Watching

Former Goodyear Fulda works

Künzeller Straße, Fulda · Germany

A 25 September 2026 transaction-counsel announcement identifies Goodyear Germany's former production-site sale to the City of Fulda. The source was retrieved through its search index; direct access returned 403. This is a municipal-control signal, not a DC launch or available campus.

Not publishedImport capacity

Next check

Review the city's completed acquisition perimeter, title-holding entity and subsequent development/disposal resolutions. Obtain public site-condition/remediation evidence and distinguish the historical broker process from any current municipal release. Establish whether demand rights survived closure and the requirements of OsthessenNetz for a new continuous load. Do not promote the pre-emption area as a released campus parcel.

Investigating

Bosch Bernolákovo production estate

Gaštanová Alej 7, 900 27 Bernolákovo, Bratislava Region · Slovakia

New September 2026 control catalyst: on 16 September Bosch confirmed phased relocation of alternator remanufacturing to Pećinci, Serbia, with production ending by late March 2027 and the Bernolákovo plant then closing. A 17 September local report quotes Bosch spokesperson Pavel Roman saying Bosch plans to sell the property and building after business and production operations transfer. This is future closure and reported sale intent, not a completed release or a launched verified sales mandate.

Not publishedImport capacity

Next check

Reconcile Gaštanová Alej 7 with cadastral titles and the production-estate boundary; establish the title-holding entity and corporate property decision-maker, disposal perimeter, release dates and whether a public sale process has launched. Review existing grid agreement and planned retention or surrender before examining a credible import route. Then check municipal land-use permissions, environmental liabilities, flood/access constraints and independently routed fibre. No approach made.

Investigating

Celanese Lanaken acetate-tow manufacturing land

Industrieweg 80, 3620 Lanaken; 2021 permit parcel Afdeling 1, Sectie C, 549 H; installation 20170810-0013 · Belgium

Historical closure signal newly surfaced. Celanese's 28 October 2025 release proposed cessation in the second half of 2026. Its 4 August 2026 results still describe progress toward that planned closure. Neither document verifies vacant possession, land release or a completed closure. This is the Celanese plant, separate from the former Sappi Lanaken property and its reported DC project.

Not publishedImport capacity

Next check

Prioritise current title and permit-perimeter reconciliation using parcel 1/C/549H and installation 20170810-0013. Establish the Celanese Production Belgium property holder and the group's corporate real-estate/disposition decision-maker, then confirm any marketing or exclusivity before preparing a conditional controlling option. Obtain closure/retention and operator-backed import documents before sizing a campus. No approach, purchase or private-data retrieval has occurred.

Watching

Courtlough family landholding

East of R132 near M1 Junction 5, Courtlough, Balbriggan, Fingal · Ireland

Historical landowner submissions newly surfaced. The April 2016 DC submission concerned 28.5 ha; the May 2022 general-employment rezoning request covers 42 ha. They are overlapping research perimeters, not two campuses or a newly announced development.

Not publishedImport capacity

Next check

Overlay the 2016 and 2022 boundaries against current title and adopted Fingal zoning. Establish the present owner mandate and promotion/developer relationships before investigating conditional control and an operator-backed connection route.

Investigating

Former Heinzel Raubling paper mill

Rosenheimer Straße 37, 83064 Raubling, Bavaria · Germany

New landowner-led planning event: the municipality's 15 September 2026 notice names Heinzel Paper as owner and announces a first public redevelopment workshop for 2 October 2026. This is a fresh redevelopment catalyst following the historical July 2024 closure decision, not a new mill-closure announcement. Commercial, research, education and residential uses are being considered; no land-release or DC project is announced.

Not publishedImport capacity

Next check

Reconcile the cadastral holding and Raubling Papier/Heinzel legal entities with the municipal planning perimeter. Review the public 2 October workshop outputs once issued and any adopted plan/closure records; establish the current property decision-maker and separate land marketing from equipment disposals. Test conditional control only after identifying a releaseable parcel, retained utility obligations and DC zoning route. Obtain site-specific upstream demand and connection-retention evidence before assigning capacity. No contact made.

Watching

Former Solvay peroxide unit within HyChem Póvoa estate

HyChem industrial estate, Rua Engenheiro Clément Dumoulin, 2625-106 Póvoa de Santa Iria, Vila Franca de Xira · Portugal

Historical closure and owner-redevelopment evidence newly surfaced. Solvay confirmed the Póvoa peroxide closure in its 24 February 2026 results; Ambigroup separately identifies its dismantling/demolition appointment. This is the former peroxide unit within a retained industrial estate, not closure or release of the whole HyChem park.

Not publishedImport capacity

Next check

Reconcile the former peroxide installation boundary and closure permit with the 2021 corporate transaction and HyChem's current masterplan. Establish whether the footprint reverts to the estate, is included in public promotion or is committed to bioindustrial reuse. Confirm retained-operation interfaces and current import/connection-retention documents before considering an independent DC proposal. No approach has been made.

Investigating

Merck / Sigma-Aldrich Arklow manufacturing site

Vale Road, Arklow, Co. Wicklow, Y14 EK18 · Ireland

Historical closure signal newly researched, not a new announcement. Wicklow Council's 3 November 2025 transcript records the announced Merck closure in 2028. Closure and vacant possession have not been verified.

Not publishedImport capacity

Next check

Reconcile the title and EPA perimeter, retained operations and release programme. Establish the corporate property decision-maker and obtain current MIC, connection-retention terms and environmental closure obligations before testing campus scale. No approach has been made.

Watching

MOD21 Ostaszewo production estate

Ostaszewo 57, 87-148 Łysomice, Toruń County, Kuyavian-Pomeranian Voivodeship · Poland

Recent 26 August 2026 owner-group catalyst, newly surfaced in this pass: ERBUD announced withdrawal from the modular segment and actions to sell fixed assets associated with MOD21. The primary announcement describes a 21,000 m² production hall and machinery with two production lines. Existing projects and warranty obligations are to be fulfilled, so neither vacancy nor an immediately released estate is established. The 2021 land acquisition is historical boundary evidence, not a new transaction.

Not publishedImport capacity

Next check

Track formal ERBUD disposal particulars and any appointed mandate; reconcile the 2021 acquisition with current land-register/cadastral titles, actual MOD21 perimeter and the specific assets or shares being sold. Establish release timetable, retained obligations, encumbrances and PSSE conditions. For a bounded independently controllable parcel, obtain the actual electricity connection and import entitlement before testing Energa/Polenergia network routes. Review the adopted local plan, environmental condition and diverse fibre. No approach made.

Watching

RDM Barcelona Cartonboard — closed mill footprint

Carrer Potassi 7, P.I. Àrea del Llobregat / ACISA, 08755 Castellbisbal, Barcelona; ETRS89 UTM 412940 / 4590634 · Spain

New regulatory milestone on a historical closure: on 17 September 2026, DOGC published the 7 September resolution accepting final cessation of the segregated cartonboard activity. The mill stopped on 27 June 2025. Retain as redevelopment market intelligence because a historical public purchaser process is documented; current outcome remains unresolved.

Not publishedImport capacity

Next check

Obtain the full May and September 2026 permit annexes, cadastral/title plans and the current RDM disposal mandate before testing conditional land control. Reconcile retained energy assets with connection agreements and network-confirmed demand rights; then check the adopted POUM, flood/contamination constraints and diverse fibre routes. No approach has been made.

Investigating

Rhodia / Solvay Salindres former fluorochemicals units

Rue Jean Moulin / Quartier Usine, 30340 Salindres, Gard; regulated establishment AIOT 0006601578 · France

Historical closure and redevelopment evidence newly surfaced. DREAL records the final-shutdown notification of 11 March 2025; the 24 February 2026 corporate results confirm closure. The operator's November 2025 committee materials identify investigations of less-constrained areas for possible early release and third-party reuse, alongside retained-platform projects. This is a specific land-release investigation, not an available campus.

Not publishedImport capacity

Next check

Retrieve the latest closure/safety and rehabilitation decisions from AIOT 0006601578 and the September 2026 DREAL committee hub. Match the possible early-release areas to cadastral title and the Osmoz/GIE reuse plans, then establish the Rhodia property decision-maker, release authority and any existing mandate before investigating a conditional option. Obtain the GIE supply agreement and upstream network/MIC evidence before testing campus scale. No contact made.

Investigating

SAPEC Bay — former Aurora land-acquisition package

Parcela B and industrial lots 43, 45 and 46, Parque Industrial SAPEC Bay, Mitrena peninsula, Setúbal; mapped in EIA 1708/2024 · Portugal

Named entity: SAPEC Parques Industriais, S.A. (October 2024 record; current title unverified)

Historical cancellation newly researched: Galp decided on 26 November 2024 not to construct Aurora after Northvolt ceased investing and replacement-partner efforts failed. This provides a specific reason to investigate whether the land acquisition package was released. It is not a new 2026 announcement, a confirmed land release or a launched DC project.

Not publishedImport capacity

Next check

Reconcile the EIA boundary with current title and the SAPEC–Aurora contract/termination documents, then establish the authorised land-release mandate and any successor commitment. Obtain remediation completion records and a current planning opinion; do not assume lithium approvals transfer to a DC. Validate any surviving E-REDES demand application, route rights and network terms before assigning power scale. No approach has been made.

Investigating

Smurfit Westrock SSK paper mill

Mount Street / Heartlands Parkway, Nechells, Birmingham, B7 5RE · United Kingdom

Historical closure decision newly researched. Smurfit Westrock's 29 June 2026 release confirmed the decision and scheduled production cessation for 27 July 2026. That release alone does not verify completed decommissioning or land release.

Not publishedImport capacity

Next check

Reconcile land title, closure completion, retained uses and the group's property decision-maker. Request a scoped land-release proposition, MIC and connection-retention documents only after the ownership/marketing screen. Obtain council case files and environmental closure evidence before a campus test fit.

Watching

Tronox Botlek pigment-plant land

Professor Gerbrandyweg 2, 3197 KK Rotterdam-Botlek, harbour 4502; DCMR case 4955682 · Netherlands

Historical idling signal newly surfaced. Tronox announced intended idling on 17 March 2025. A South Holland notice of 17 April 2026 records its 14 April application to put the revision permit temporarily in repose (DCMR 4955682). The issuer's 5 August 2026 results still carry Botlek closure charges. These are concrete transition signals, not a declared surplus-land sale or confirmed permanent release.

Not publishedImport capacity

Next check

Track the decision and attachments for DCMR 4955682 / request 2026041400499 and reconcile the installation with cadastral title before treating the address as a purchasable parcel. Establish whether the group intends disposal, retained mothballing or another industrial use and identify the authorised property decision-maker. Only after that gate, prepare a conditional purchase/lease proposition and obtain connection-retention and import documents. No contact has been made.

Watching

Vetropack St-Prex former glassworks — redevelopment estate

Rue de la Verrerie 2a / Rue de la Verrerie, 1162 Saint-Prex, Vaud · Switzerland

Recent owner-led surplus-property evidence following the historical 2024 production closure. Vetropack's H1 2026 report explicitly describes continuing preparation for long-term redevelopment of property no longer required for operations. Its 6 March 2026 notice confirms cullet processing ended in February; the 31 August 2026 update reports furnace dismantling progress and final residual material shipments in mid-August, with some decommissioning still outstanding.

Not publishedImport capacity

Next check

Keep as a land-redevelopment watch, not a qualified opportunity. Match the cadastral former-production footprint to the current hall-letting plans and Vetropack's redevelopment scope. Establish the current property mandate, lease commitments and municipal/cantonal reuse requirements before testing any separately released area. Retrieve closure/remediation and planning files, then seek scoped operator evidence for the actual electrical connection. No approach made.

Watching

ArcelorMittal Duisburg upstream units

Duisburg · Germany

The company intends to close the steel shop and billet rolling mill after hot-metal supply ends in September 2027, while retaining wire-rod production.

Not publishedImport capacity

Next check

Look for a separately controllable surplus-land declaration and identify the relevant demand-network operator and rights holder.

Watching

Baiersbronn Frischfaser Karton mill

Baiersbronn · Germany

Eurofound records permanent closure in September 2026 after insolvency and an unsuccessful search for investment.

Not publishedImport capacity

Next check

Identify the authorised administrator and title holder from public records, then check property-process status and retained electrical rights.

Watching

Ballysimon House / Commons Road lands

South of Old Ballysimon Road, west of Commons Road (L1171), Limerick · Ireland

Newly identified historical landowner signal: MKO’s 6 September 2021 submission LCC-C62-162 sought data-centre zoning for approximately 33.4 ha on behalf of David Fitzgerald and Family. It is a specific landowner-led development ambition, not a newly announced 2026 acquisition or an available powered-land listing.

Not publishedImport capacity

Next check

Check the current zoning map and any superseding variation before spending on a connection study. Reconcile the 33.4 ha submission red line with title and retained residential uses. If planning can be advanced, investigate a conditional controlling option and request operator-backed demand feasibility. No contact has been made.

Investigating

BD / Becton Dickinson Donore Road plant

Donore Road, Drogheda, Co. Louth · Ireland

Fresh closure signal: LMFM reported final production ending on 25 September 2026, with a small decommissioning team remaining. SIPTU’s April 2025 statement independently records the phased closure timetable. Newly researched here on 26 September; this is not a confirmed land sale.

Not publishedImport capacity

Next check

Prioritise a public parcel/title, planning and retained-use review while decommissioning is underway. Establish the landholding entity, supply point, contracted MIC, network operator and disconnect/retention plan. Prepare a corporate-property option proposition subject to grid and planning diligence for a later authorised approach. No contact has been made.

Investigating

Dow Barry — upstream siloxanes footprint

Barry Silicone Plant, Cardiff Road, Barry, Vale of Glamorgan, CF63 2YL · United Kingdom

Updated from the 24 September review: Dow’s results dated 23 July 2026 confirm that the upstream siloxanes plant shut during Q2 2026. The wider Barry site remains in operation.

Not publishedImport capacity

Next check

Prepare an owner-ready one-page proposal for an option over the redundant unit, then obtain public title/permitting boundaries before an authorised approach to Dow UK site management and corporate real estate. Request a redline of retained operations and a separate land-and-utilities rights schedule. No approach has been made.

Watching

Dow Schkopau — chlor-alkali and vinyl unit

Dow industrial complex, Straße B 13, 06258 Schkopau, Saxony-Anhalt · Germany

Dow’s 7 July 2025 board-approved plan schedules closure of the Schkopau chlor-alkali and vinyl assets for Q4 2027. The wider chemical park remains active.

Not publishedImport capacity

Next check

Map the exact CAV boundary and supply point using public environmental records; distinguish it from marketed ValuePark plots. Seek a future owner-led release signal before spending on a connection study.

Watching

FMC / Cheminova Rønland plant

Rønland, Western Jutland · Denmark

Eurofound records a decision to cease production by 31 December 2026. A primary corporate disposal notice was not retrieved.

Not publishedImport capacity

Next check

Find a primary closure/reuse statement and land boundary; then investigate title, remediation and an operator-backed demand route.

Watching

Ultinon Motion Poland factory

Pabianice · Poland

Eurofound records a bankruptcy-related factory closure by December 2026 following an unsuccessful investor search.

Not publishedImport capacity

Next check

Reconcile current title and administrator mandate, locate the exact site boundary and verify the demand-connection record before upgrading.

Watching

Mondi Brzeźno corrugated-packaging plant

Brzeźno, gmina Dorohusk, Lubelskie · Poland

Eurofound records a planned plant closure by 30 September 2026 as part of Mondi's production-footprint reduction; the cited corporate item was not retrieved.

Not publishedImport capacity

Next check

Retrieve the underlying corporate notice, establish title and the plant boundary, then validate the network route and current marketing status.

Watching

Dow Böhlen ethylene-cracker area

Böhlen · Germany

Dow's closure programme schedules shutdown of the ethylene cracker in Q4 2027; decommissioning may continue through 2029.

Not publishedImport capacity

Next check

Locate a parcel-specific reuse/disposal notice and retained-operations plan before title, environmental and demand-connection investigation.

Watching

Schneider Electric Chasseneuil factory

Chasseneuil-du-Poitou · France

Reuters reported an intended factory closure by March 2028 and relocation of production.

Not publishedImport capacity

Next check

Find the primary corporate/municipal closure notice and title boundary, then test the named network route and current marketing status.

Watching

Metsä Fibre Joutseno pulp mill

Joutseno · Finland

The group H1 2026 report described market-related idling from late March through Q2.

Not publishedImport capacity

Next check

Watch for a primary permanent-change or disposal notice identifying the exact unit and land before undertaking site-specific demand diligence.

Watching

Taranto former Ilva steelworks

Taranto · Italy

Reuters reported a court-confirmed blast-furnace shutdown connected to environmental-safety issues.

Not publishedImport capacity

Next check

Identify a discrete parcel released outside retained industrial operations and obtain primary control and network evidence.