Recorded research reviews across data centres and land.

Demand & infrastructure signals
234 matching entries

A review is a research check, not a new project announcement. Open a record for its source evidence.

Former Heinzel Raubling paper millInvestigating

Rosenheimer Straße 37, 83064 Raubling, Bavaria, Germany

New landowner-led planning event: the municipality's 15 September 2026 notice names Heinzel Paper as owner and announces a first public redevelopment workshop for 2 October 2026. This is a fresh redevelopment catalyst following the historical July 2024 closure decision, not a new mill-closure announcement. Commercial, research, education and residential uses are being considered; no land-release or DC project is announced.

Review context

New landowner-led planning event: the municipality's 15 September 2026 notice names Heinzel Paper as owner and announces a first public redevelopment workshop for 2 October 2026. This is a fresh redevelopment catalyst following the historical July 2024 closure decision, not a new mill-closure announcement. Commercial, research, education and residential uses are being considered; no land-release or DC project is announced.

Next check: Reconcile the cadastral holding and Raubling Papier/Heinzel legal entities with the municipal planning perimeter. Review the public 2 October workshop outputs once issued and any adopted plan/closure records; establish the current property decision-maker and separate land marketing from equipment disposals. Test conditional control only after identifying a releaseable parcel, retained utility obligations and DC zoning route. Obtain site-specific upstream demand and connection-retention evidence before assigning capacity. No contact made.

Open full evidence
Former Solvay peroxide unit within HyChem Póvoa estateWatching

HyChem industrial estate, Rua Engenheiro Clément Dumoulin, 2625-106 Póvoa de Santa Iria, Vila Franca de Xira, Portugal

Historical closure and owner-redevelopment evidence newly surfaced. Solvay confirmed the Póvoa peroxide closure in its 24 February 2026 results; Ambigroup separately identifies its dismantling/demolition appointment. This is the former peroxide unit within a retained industrial estate, not closure or release of the whole HyChem park.

Review context

Historical closure and owner-redevelopment evidence newly surfaced. Solvay confirmed the Póvoa peroxide closure in its 24 February 2026 results; Ambigroup separately identifies its dismantling/demolition appointment. This is the former peroxide unit within a retained industrial estate, not closure or release of the whole HyChem park.

Next check: Reconcile the former peroxide installation boundary and closure permit with the 2021 corporate transaction and HyChem's current masterplan. Establish whether the footprint reverts to the estate, is included in public promotion or is committed to bioindustrial reuse. Confirm retained-operation interfaces and current import/connection-retention documents before considering an independent DC proposal. No approach has been made.

Open full evidence
Former Sundeala site, Middle MillRuled out

Middle Mill, Cam, Dursley, GL11 5LQ, United Kingdom

Public auction marketing encountered during industrial-closure screening. Savills' September 2026 catalogue advertises the former manufacturing property, with the lot description naming 30 September. It is not an off-market lead.

Review context

Public auction marketing encountered during industrial-closure screening. Savills' September 2026 catalogue advertises the former manufacturing property, with the lot description naming 30 September. It is not an off-market lead.

Next check: Retain only as a marketed exclusion. Do not alert as an opportunity or infer an auction result from unrendered status labels in the page template.

Open full evidence
Former Sunila pulp millRuled out

Sunila, Kotka, Finland

Material correction to the earlier screen: Stora Enso's FY2024 report confirms that disposal to AALTO Development completed in December 2024. AALTO now publicly promotes the Sunila industrial estate. This resolves the previously unverified transaction completion but fails off-market clearance.

Review context

Material correction to the earlier screen: Stora Enso's FY2024 report confirms that disposal to AALTO Development completed in December 2024. AALTO now publicly promotes the Sunila industrial estate. This resolves the previously unverified transaction completion but fails off-market clearance.

Next check: Retain as marketed-site intelligence. Reopen only for a demonstrably separate unmarketed parcel with verified title/control, tenancy separation, heritage/planning feasibility and operator-backed continuous import rights.

Open full evidence
Former Wyeth manufacturing facility, AskeatonRuled out

Askeaton, Co. Limerick, Ireland

Previously screened historical exclusion now recorded explicitly. Colliers' 5 June 2025 announcement publicly offered the manufacturing facility; Pfanstiehl's August 2026 news page announces acquisition of an Askeaton manufacturing site.

Review context

Previously screened historical exclusion now recorded explicitly. Colliers' 5 June 2025 announcement publicly offered the manufacturing facility; Pfanstiehl's August 2026 news page announces acquisition of an Askeaton manufacturing site.

Next check: Retain as a marketed/committed-use exclusion. Reopen only for a separately evidenced surplus parcel with independently obtainable control and an operator-backed import route. Do not treat the adjoining farmland as the manufacturing site.

Open full evidence
Glesys Pori / The RockOperating

Ulvila / Pori, Kivipellontie, Finland

Existing underground campus at Kivipellontie in Ulvila, known as The Rock under Ficolo and Verne. Glesys completed operational integration in February 2026. Named carrier and liquid-cooling evidence is published; land title and import entitlements remain unverified.

Review context

Existing underground campus at Kivipellontie in Ulvila, known as The Rock under Ficolo and Verne. Glesys completed operational integration in February 2026. Named carrier and liquid-cooling evidence is published; land title and import entitlements remain unverified.

Latest dated source: 16 Jun 2026. This is a source publication date, not the review or construction date.

Open full evidence
Google Hanau campusOperating

Hanau-Wolfgang, Germany

Google-operated Frankfurt-region infrastructure on the former Wolfgang bunker site, with a further expansion started in April 2026. The municipal strategy identifies EAM Netz as the site connection provider. The city climate model uses an assumed 40 MVA for Google, which is not a published import entitlement and is excluded from capacity fields. Not an off-market opportunity.

Review context

Google-operated Frankfurt-region infrastructure on the former Wolfgang bunker site, with a further expansion started in April 2026. The municipal strategy identifies EAM Netz as the site connection provider. The city climate model uses an assumed 40 MVA for Google, which is not a published import entitlement and is excluded from capacity fields. Not an off-market opportunity.

Latest dated source: 28 Apr 2026. This is a source publication date, not the review or construction date.

Open full evidence
Google Waltham CrossOperating

Waltham Cross / Cheshunt, Hertfordshire, United Kingdom

Operating Google campus at Maxwells Farm West, Great Cambridge Road. Council case evidence and named specialist packages supplement the opening announcement; import MW/MVA and registered land-title entity remain unverified.

Review context

Operating Google campus at Maxwells Farm West, Great Cambridge Road. Council case evidence and named specialist packages supplement the opening announcement; import MW/MVA and registered land-title entity remain unverified.

Latest dated source: 16 Sept 2025. This is a source publication date, not the review or construction date.

Open full evidence
Green Campus ZRH2 DielsdorfOperating

Dielsdorf, Switzerland

Operating Dielsdorf campus with a third data centre still under construction. Municipal project-change consent, EKZ supply infrastructure and Energie 360° heat-network milestones now supplement operator and contractor evidence.

Review context

Operating Dielsdorf campus with a third data centre still under construction. Municipal project-change consent, EKZ supply infrastructure and Energie 360° heat-network milestones now supplement operator and contractor evidence.

Latest dated source: 20 Jan 2025. This is a source publication date, not the review or construction date.

Open full evidence
Green Mountain OSL-HamarOperating

Hamar / Heggvin, Norway

Operating single-tenant campus committed to TikTok, with municipal development-agreement and NVE connection records. Historic early-construction enforcement is retained alongside subsequent lawful licensing; no independent development opportunity is established.

Review context

Operating single-tenant campus committed to TikTok, with municipal development-agreement and NVE connection records. Historic early-construction enforcement is retained alongside subsequent lawful licensing; no independent development opportunity is established.

Latest dated source: 23 May 2025. This is a source publication date, not the review or construction date.

Open full evidence
IPKO — Fushë Kosovë Data CenterOperating

Fushë Kosovë, Kosovo

Existing IPKO data center in Fushë Kosovë's industrial area. Its separate spare location in Pristina is excluded from this record. Generator ratings are not treated as IT or site power capacity.

Review context

Existing IPKO data center in Fushë Kosovë's industrial area. Its separate spare location in Pristina is excluded from this record. Generator ratings are not treated as IT or site power capacity.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Kao Data KLON-02Operating

Harlow, United Kingdom

Operating Harlow building. Base 8.8 MW and expandable 10 MW ratings are retained separately; June 2026 generator permit and campus fibre evidence add environmental and connectivity detail.

Review context

Operating Harlow building. Base 8.8 MW and expandable 10 MW ratings are retained separately; June 2026 generator permit and campus fibre evidence add environmental and connectivity detail.

Latest dated source: 3 Jun 2026. This is a source publication date, not the review or construction date.

Open full evidence
Kao Data KLON-03Under construction

Harlow, United Kingdom

Third Harlow building with hybrid air/direct-to-chip cooling. JCA is linked to the phase; permit issue and the Q4 2026 target are recorded separately from unconfirmed operational handover.

Review context

Third Harlow building with hybrid air/direct-to-chip cooling. JCA is linked to the phase; permit issue and the Q4 2026 target are recorded separately from unconfirmed operational handover.

Latest dated source: 3 Jun 2026. This is a source publication date, not the review or construction date.

Open full evidence
Kragujevac State Data CentreOperating

Kragujevac, Serbia

Operating state campus, with original parcel and construction/use permit references now traced through the government audit. Millennium Team and Beopotez have phase-specific roles. The 14 MW government energy-capacity statement remains unclassified by import/IT scope.

Review context

Operating state campus, with original parcel and construction/use permit references now traced through the government audit. Millennium Team and Beopotez have phase-specific roles. The 14 MW government energy-capacity statement remains unclassified by import/IT scope.

Latest dated source: 30 Apr 2026. This is a source publication date, not the review or construction date.

Open full evidence
Kruonis DC — proposed developmentIn planning

Kruonis, Lithuania

Early Lithuanian project under public partner selection. Ignitis proposes a controlling-stake transfer in UAB Kruonis DC; no signed transaction, parcel title or numerical demand allocation is established. Market intelligence only.

Review context

Early Lithuanian project under public partner selection. Ignitis proposes a controlling-stake transfer in UAB Kruonis DC; no signed transaction, parcel title or numerical demand allocation is established. Market intelligence only.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
LANACO Technology Center data centreOperating

Banja Luka, Bosnia and Herzegovina

Operating cloud and colocation facility within the LANACO Technology Center in the Incel business zone. Electrical/cooling supplier scope and service evidence are available; land title, permission conditions and campus import capacity remain unverified. This is operator-controlled market intelligence, not an available land offer.

Review context

Operating cloud and colocation facility within the LANACO Technology Center in the Incel business zone. Electrical/cooling supplier scope and service evidence are available; land title, permission conditions and campus import capacity remain unverified. This is operator-controlled market intelligence, not an available land offer.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
LCL Brussels-WestOperating

Aalst / Erembodegem, Belgium

Existing colocation campus at Industrielaan 3 and 7, Erembodegem, with successive hall and cooling upgrades. Council records identify NV LCL and permit references. Backup generation is documented, but contracted utility import capacity and the land-owning entity remain unverified. Market intelligence, not an available land offer.

Review context

Existing colocation campus at Industrielaan 3 and 7, Erembodegem, with successive hall and cooling upgrades. Council records identify NV LCL and permit references. Backup generation is documented, but contracted utility import capacity and the land-owning entity remain unverified. Market intelligence, not an available land offer.

Latest dated source: 27 Jun 2023. This is a source publication date, not the review or construction date.

Open full evidence
LuxConnect Bettembourg campus — DC1.1/DC1.2/DC1.3Operating

Bettembourg, Luxembourg

Established three-building campus with building-specific design teams and separately stated redundant electrical legs. Office/parking and heat-recovery works are tracked without adding data-hall capacity.

Review context

Established three-building campus with building-specific design teams and separately stated redundant electrical legs. Office/parking and heat-recovery works are tracked without adding data-hall capacity.

Latest dated source: 26 May 2026. This is a source publication date, not the review or construction date.

Open full evidence
LuxConnect DC2Operating

Bissen, Luxembourg

Bissen facility with phase-specific architectural, technical-engineering and project-management evidence. Its dual 12.6 MVA legs remain separate from secured import or spare capacity.

Review context

Bissen facility with phase-specific architectural, technical-engineering and project-management evidence. Its dual 12.6 MVA legs remain separate from secured import or spare capacity.

Latest dated source: 8 Jun 2016. This is a source publication date, not the review or construction date.

Open full evidence
maincubes FRA03 — SchwalbachOperating

Schwalbach am Taunus, Frankfurt region, Germany

First phase operating; 16 MW IT covers the overall facility. SPIE/Lupp delivery roles and the signed Süwag heat agreement are confirmed, with the separate municipal heat-network service target in 2028.

Review context

First phase operating; 16 MW IT covers the overall facility. SPIE/Lupp delivery roles and the signed Süwag heat agreement are confirmed, with the separate municipal heat-network service target in 2028.

Latest dated source: 14 Apr 2026. This is a source publication date, not the review or construction date.

Open full evidence
maincubes FRA04 — DietzenbachIn planning

Dietzenbach, Frankfurt region, Germany

Planning-stage conversion of the former logistics property at Assar-Gabrielsson-Strasse 11–13, purchased from a CBRE Investment Management-managed fund. Current site specification targets Q3 2029; historic 2027 target is superseded.

Review context

Planning-stage conversion of the former logistics property at Assar-Gabrielsson-Strasse 11–13, purchased from a CBRE Investment Management-managed fund. Current site specification targets Q3 2029; historic 2027 target is superseded.

Latest dated source: 7 May 2024. This is a source publication date, not the review or construction date.

Open full evidence
Merck / Sigma-Aldrich Arklow manufacturing siteInvestigating

Vale Road, Arklow, Co. Wicklow, Y14 EK18, Ireland

Historical closure signal newly researched, not a new announcement. Wicklow Council's 3 November 2025 transcript records the announced Merck closure in 2028. Closure and vacant possession have not been verified.

Review context

Historical closure signal newly researched, not a new announcement. Wicklow Council's 3 November 2025 transcript records the announced Merck closure in 2028. Closure and vacant possession have not been verified.

Next check: Reconcile the title and EPA perimeter, retained operations and release programme. Establish the corporate property decision-maker and obtain current MIC, connection-retention terms and environmental closure obligations before testing campus scale. No approach has been made.

Open full evidence
MERLIN Edged Barcelona — PLZFOperating

Barcelona, Zona Franca, Spain

Operating Zona Franca facility with 22 MW IT supported by MERLIN's asset-specific presentation and July repowering update. Waterless cooling and diverse entries are operator specifications; leased capacity is not available capacity.

Review context

Operating Zona Franca facility with 22 MW IT supported by MERLIN's asset-specific presentation and July repowering update. Waterless cooling and diverse entries are operator specifications; leased capacity is not available capacity.

Latest dated source: 28 Jul 2026. This is a source publication date, not the review or construction date.

Open full evidence
MERLIN Zaragoza Wind data centre proposalIn planning

Botorrita, Zaragoza, Aragón, Spain

Botorrita proposal in Polígono Industrial San Antonio and adjoining parcels. Aragón confirms the DIGA and reports power linked to named access permits; the construction-enabling PIGA and original electrical rights still require review.

Review context

Botorrita proposal in Polígono Industrial San Antonio and adjoining parcels. Aragón confirms the DIGA and reports power linked to named access permits; the construction-enabling PIGA and original electrical rights still require review.

Latest dated source: 28 Jul 2026. This is a source publication date, not the review or construction date.

Open full evidence
Meta Odense data centreOperating

Odense / Tietgenbyen, Denmark

Operating Meta campus at Tietgenbyen. Cassin Networks ApS is the environmental-permit entity at M.P. Allerups Vej 48, parcel 38a Fraugde. A June 2026 backup-fuel amendment needs decision follow-up; thermal heat and regional renewable-generation figures are excluded from electrical import capacity.

Review context

Operating Meta campus at Tietgenbyen. Cassin Networks ApS is the environmental-permit entity at M.P. Allerups Vej 48, parcel 38a Fraugde. A June 2026 backup-fuel amendment needs decision follow-up; thermal heat and regional renewable-generation figures are excluded from electrical import capacity.

Latest dated source: 3 Jun 2026. This is a source publication date, not the review or construction date.

Open full evidence
MivoCloud — Chișinău Data CenterOperating

Chișinău, Moldova

Operator-owned Chișinău facility established by an explicit operator statement, with current local service availability. No commissioning date, named construction team, or facility power capacity established.

Review context

Operator-owned Chișinău facility established by an explicit operator statement, with current local service availability. No commissioning date, named construction team, or facility power capacity established.

Latest dated source: 5 Feb 2024. This is a source publication date, not the review or construction date.

Open full evidence
MOD21 Ostaszewo production estateWatching

Ostaszewo 57, 87-148 Łysomice, Toruń County, Kuyavian-Pomeranian Voivodeship, Poland

Recent 26 August 2026 owner-group catalyst, newly surfaced in this pass: ERBUD announced withdrawal from the modular segment and actions to sell fixed assets associated with MOD21. The primary announcement describes a 21,000 m² production hall and machinery with two production lines. Existing projects and warranty obligations are to be fulfilled, so neither vacancy nor an immediately released estate is established. The 2021 land acquisition is historical boundary evidence, not a new transaction.

Review context

Recent 26 August 2026 owner-group catalyst, newly surfaced in this pass: ERBUD announced withdrawal from the modular segment and actions to sell fixed assets associated with MOD21. The primary announcement describes a 21,000 m² production hall and machinery with two production lines. Existing projects and warranty obligations are to be fulfilled, so neither vacancy nor an immediately released estate is established. The 2021 land acquisition is historical boundary evidence, not a new transaction.

Next check: Track formal ERBUD disposal particulars and any appointed mandate; reconcile the 2021 acquisition with current land-register/cadastral titles, actual MOD21 perimeter and the specific assets or shares being sold. Establish release timetable, retained obligations, encumbrances and PSSE conditions. For a bounded independently controllable parcel, obtain the actual electricity connection and import entitlement before testing Energa/Polenergia network routes. Review the adopted local plan, environmental condition and diverse fibre. No approach made.

Open full evidence
Monaco Telecom DC3Operating

Fontvieille, Monaco

Bounded Fontvieille facility at 4–6 avenue Albert II. Equipment ratings are not treated as grid import or IT capacity; legal title remains unverified.

Review context

Bounded Fontvieille facility at 4–6 avenue Albert II. Equipment ratings are not treated as grid import or IT capacity; legal title remains unverified.

Latest dated source: 5 Nov 2025. This is a source publication date, not the review or construction date.

Open full evidence
Nessus Data Center 3Operating

Vienna, Austria

Operating colocation at Stadlauer Strasse 66, supporting geographic redundancy with Nessus’s southern Vienna sites through a route-redundant fibre ring. Published cooling uses cold-aisle containment and adiabatic systems; ownership and construction appointments remain unverified.

Review context

Operating colocation at Stadlauer Strasse 66, supporting geographic redundancy with Nessus’s southern Vienna sites through a route-redundant fibre ring. Published cooling uses cold-aisle containment and adiabatic systems; ownership and construction appointments remain unverified.

Latest dated source: 7 Oct 2025. This is a source publication date, not the review or construction date.

Open full evidence
NorthC AalsmeerOperating

Aalsmeer, Netherlands

Lakenblekerstraat 13 facility; expansions remain within this record.

Review context

Lakenblekerstraat 13 facility; expansions remain within this record.

Latest dated source: 18 Feb 2025. This is a source publication date, not the review or construction date.

Open full evidence

This feed combines the latest recorded project and land reviews with saved legacy record notes. It is not a complete field-by-field change history.