Compare the original dossier set against your assumptions and inspect its evidence. Newly reviewed candidates and exclusions are in Research. No current dossier meets the off-market control and power qualification gates.

3 detailed dossiers 13 linked sourcesActive brief · 20 MW / 12 ac / 2029Browse all research
EUROPEEleanUPM HürthPO11
3 Europe
Minimum IT load
Minimum land
Required by

3 dossiers

Scenario ranking uses historical screening assumptions. It does not verify a demand connection, usable area, delivery date or acquisition rights.

Comparable / watch · Power D
Compare

NL-RTM-PO11-03 · Australiëweg 7, Rotterdam-Maasvlakte

PO11 Maasvlakte

88SCENARIO
Potential supply · MVAUnknown
Not established
Secured importNot verified

A site-specific demand connection or evidenced supply assessment is still needed.

Public comparableMarketing not verifiedDocument seen
Established AZ market2 AZ-backed provider regions · parcel inclusion unverified

A closing 60 ha chemicals complex in Europe's largest port, with exceptional infrastructure context and equally serious decommissioning, policy and power-allocation questions.

IT scenario38–50 MWLand148 acresUnverified timingPost-2026 / unconfirmed
Source-linked research5 references

Control and import rights remain unverified.

Power position

Energy-hub adjacency is strategically valuable, but no allocation for a data-centre load is confirmed.

Principal constraint

Seveso/RIE-4 decommissioning obligations and Dutch data-centre policy could override an otherwise strong physical-site thesis.

Research only · Power D
Compare

DE-NRW-HUR-02 · Hürth, North Rhine-Westphalia

Former UPM Mill, Hürth

87SCENARIO
Potential supply · MVAUnknown
Not established
Secured importNot verified

A site-specific demand connection or evidenced supply assessment is still needed.

Reverse originatedMarketing not verifiedIndependently corroborated
Adjacent AZ market3 AZ-backed provider regions · parcel inclusion unverified

A closed, energy-intensive industrial facility inside a dense German infrastructure corridor, with credible land quantum and corporate ownership visibility.

IT scenario20–30 MWLand26.1 acresUnverified timing2029+ indicative
Source-linked research4 references

Control and import rights remain unverified.

Power position

Historic public-grid consumption supports further inquiry; no surviving connection entitlement or firm capacity is evidenced.

Principal constraint

Historic industrial demand does not establish that capacity is available, transferable or suitable for a new high-load connection.

Research only · Power D
Compare

UK-CAM-ELN-01 · Sutton, Ely, Cambridgeshire

Elean Power Station

79SCENARIO
Potential supply · MVAUnknown
Not established
Secured importNot verified

A site-specific demand connection or evidenced supply assessment is still needed.

Reverse originatedMarketing not verifiedIndependently corroborated
Adjacent AZ market3 AZ-backed provider regions · parcel inclusion unverified

A compact biomass-generation site with an established industrial footprint and a traceable operating-company route in Cambridgeshire.

IT scenario20–23 MWLand7.7 ha permittedUnverified timing2028–29 indicative
Source-linked research4 references

Control and import rights remain unverified.

Power position

The permitted 38 MWe export plant evidences a grid connection, not capacity available to import for a data-centre load.

Principal constraint

A former generator can be well connected for export without having sufficient import capacity for a data centre. That distinction remains unresolved.