SWE02 enabling works are confirmed on Akalla 4:8, distinct from SWE01. Municipal ground lease and existing-plan compatibility are documented; consent conditions, energisation and programme reconciliation remain open.
Review context
SWE02 enabling works are confirmed on Akalla 4:8, distinct from SWE01. Municipal ground lease and existing-plan compatibility are documented; consent conditions, energisation and programme reconciliation remain open.
Latest dated source: 29 Jun 2026. This is a source publication date, not the review or construction date.
Developer-controlled Hamre campus with reported phase-one connection agreement and outstanding permissions. H1 versus autumn 2028 programme claims and the operator area discrepancy remain visible; not an off-market land offer.
Review context
Developer-controlled Hamre campus with reported phase-one connection agreement and outstanding permissions. H1 versus autumn 2028 programme claims and the operator area discrepancy remain visible; not an off-market land offer.
Latest dated source: 28 May 2026. This is a source publication date, not the review or construction date.
Gaštanová Alej 7, 900 27 Bernolákovo, Bratislava Region, Slovakia
New September 2026 control catalyst: on 16 September Bosch confirmed phased relocation of alternator remanufacturing to Pećinci, Serbia, with production ending by late March 2027 and the Bernolákovo plant then closing. A 17 September local report quotes Bosch spokesperson Pavel Roman saying Bosch plans to sell the property and building after business and production operations transfer. This is future closure and reported sale intent, not a completed release or a launched verified sales mandate.
Review context
New September 2026 control catalyst: on 16 September Bosch confirmed phased relocation of alternator remanufacturing to Pećinci, Serbia, with production ending by late March 2027 and the Bernolákovo plant then closing. A 17 September local report quotes Bosch spokesperson Pavel Roman saying Bosch plans to sell the property and building after business and production operations transfer. This is future closure and reported sale intent, not a completed release or a launched verified sales mandate.
Next check: Reconcile Gaštanová Alej 7 with cadastral titles and the production-estate boundary; establish the title-holding entity and corporate property decision-maker, disposal perimeter, release dates and whether a public sale process has launched. Review existing grid agreement and planned retention or surrender before examining a credible import route. Then check municipal land-use permissions, environmental liabilities, flood/access constraints and independently routed fibre. No approach made.
Historical closure signal newly surfaced. Celanese's 28 October 2025 release proposed cessation in the second half of 2026. Its 4 August 2026 results still describe progress toward that planned closure. Neither document verifies vacant possession, land release or a completed closure. This is the Celanese plant, separate from the former Sappi Lanaken property and its reported DC project.
Review context
Historical closure signal newly surfaced. Celanese's 28 October 2025 release proposed cessation in the second half of 2026. Its 4 August 2026 results still describe progress toward that planned closure. Neither document verifies vacant possession, land release or a completed closure. This is the Celanese plant, separate from the former Sappi Lanaken property and its reported DC project.
Next check: Prioritise current title and permit-perimeter reconciliation using parcel 1/C/549H and installation 20170810-0013. Establish the Celanese Production Belgium property holder and the group's corporate real-estate/disposition decision-maker, then confirm any marketing or exclusivity before preparing a conditional controlling option. Obtain closure/retention and operator-backed import documents before sizing a campus. No approach, purchase or private-data retrieval has occurred.
CloudHQ campus on Rue Léonard de Vinci, Lisses. Regulator establishment 0006523753 identifies the operating entity and environmental orders. A 2021 environmental opinion describes the site-specific Les Aqueducs grid route. Permit conditions, commissioned phase capacity and title remain separate diligence questions. Launched developer-controlled campus, not off-market land.
Review context
CloudHQ campus on Rue Léonard de Vinci, Lisses. Regulator establishment 0006523753 identifies the operating entity and environmental orders. A 2021 environmental opinion describes the site-specific Les Aqueducs grid route. Permit conditions, commissioned phase capacity and title remain separate diligence questions. Launched developer-controlled campus, not off-market land.
Latest dated source: 23 Nov 2022. This is a source publication date, not the review or construction date.
East of R132 near M1 Junction 5, Courtlough, Balbriggan, Fingal, Ireland
Historical landowner submissions newly surfaced. The April 2016 DC submission concerned 28.5 ha; the May 2022 general-employment rezoning request covers 42 ha. They are overlapping research perimeters, not two campuses or a newly announced development.
Review context
Historical landowner submissions newly surfaced. The April 2016 DC submission concerned 28.5 ha; the May 2022 general-employment rezoning request covers 42 ha. They are overlapping research perimeters, not two campuses or a newly announced development.
Next check: Overlay the 2016 and 2022 boundaries against current title and adopted Fingal zoning. Establish the present owner mandate and promotion/developer relationships before investigating conditional control and an operator-backed connection route.
Approved Iver Heath scheme, application PL/24/2130/FA. Current 108 MW IT/160 MVA specification differs from the 2025 90 MW design; construction start, import rights and design reconciliation remain open.
Review context
Approved Iver Heath scheme, application PL/24/2130/FA. Current 108 MW IT/160 MVA specification differs from the 2025 90 MW design; construction start, import rights and design reconciliation remain open.
Latest dated source: 20 Jun 2025. This is a source publication date, not the review or construction date.
Operating Larnaca facility on Alpeon Street. Historical facility newly captured, with Cyta acquisition evidence and scoped technical specifications; no independent land opportunity is implied.
Review context
Operating Larnaca facility on Alpeon Street. Historical facility newly captured, with Cyta acquisition evidence and scoped technical specifications; no independent land opportunity is implied.
Latest dated source: 23 May 2025. This is a source publication date, not the review or construction date.
Existing Via Monzoro campus with active interconnection and later building works. Newly surfaced historical facility; the masterplan environmental review is a live monitoring issue, not proof of campus closure or land availability.
Review context
Existing Via Monzoro campus with active interconnection and later building works. Newly surfaced historical facility; the masterplan environmental review is a live monitoring issue, not proof of campus closure or land availability.
Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.
Operating Marcoussis campus with separately evidenced expansion and occupied-building retrofit packages. Official environmental authorisation and phase-specific contractor/carrier evidence now supplement operator specifications; current import rights and phase completion still require reconciliation.
Review context
Operating Marcoussis campus with separately evidenced expansion and occupied-building retrofit packages. Official environmental authorisation and phase-specific contractor/carrier evidence now supplement operator specifications; current import rights and phase completion still require reconciliation.
Latest dated source: 10 Sept 2026. This is a source publication date, not the review or construction date.
Nozay redevelopment with three proposed data-centre buildings, a substation and heat recovery. The whole acquired holding and the application footprint differ.
Review context
Nozay redevelopment with three proposed data-centre buildings, a substation and heat recovery. The whole acquired holding and the application footprint differ.
Latest dated source: 15 Feb 2026. This is a source publication date, not the review or construction date.
Operating campus at Ivane Brlić-Mažuranić 30, with a council-identified parcel and CIX3 exchange node. Ilkari integration is documented; current registered title and import rights remain unverified. Historical project newly added to the directory, not an off-market land opportunity.
Review context
Operating campus at Ivane Brlić-Mažuranić 30, with a council-identified parcel and CIX3 exchange node. Ilkari integration is documented; current registered title and import rights remain unverified. Historical project newly added to the directory, not an off-market land opportunity.
Latest dated source: 24 Jun 2026. This is a source publication date, not the review or construction date.
New Baltic AI/HPC facility. Supplier relationships are explicitly scoped; unrelated contractor tags elsewhere on a supplier website are not treated as project appointments.
Review context
New Baltic AI/HPC facility. Supplier relationships are explicitly scoped; unrelated contractor tags elsewhere on a supplier website are not treated as project appointments.
Latest dated source: 15 Apr 2026. This is a source publication date, not the review or construction date.
Operating Vilnius facility formerly branded Data Inn. Current power specification is a facility total; contractor and consultant history remain to be established.
Review context
Operating Vilnius facility formerly branded Data Inn. Current power specification is a facility total; contractor and consultant history remain to be established.
Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.
Phased operating facility at Schiphol-Rijk. A dated operator release resolves the previous opening conflict; full four-phase readiness is still unverified.
Review context
Phased operating facility at Schiphol-Rijk. A dated operator release resolves the previous opening conflict; full four-phase readiness is still unverified.
Latest dated source: 9 Dec 2025. This is a source publication date, not the review or construction date.
Operating Barcelona facility with named lead designer and technical factsheet. The designer’s historical 15 MW IT differs from the opening release’s 14 MW unspecified planned capacity; neither establishes available import rights.
Review context
Operating Barcelona facility with named lead designer and technical factsheet. The designer’s historical 15 MW IT differs from the opening release’s 14 MW unspecified planned capacity; neither establishes available import rights.
Latest dated source: 18 May 2026. This is a source publication date, not the review or construction date.
Operating first facility at Digital Park Fechenheim. State permit Gen2021/040 identifies FRA17 within the campus generator consent and records brownfield remediation and baseline-report conditions; 10.2 MW remains design IT capacity.
Review context
Operating first facility at Digital Park Fechenheim. State permit Gen2021/040 identifies FRA17 within the campus generator consent and records brownfield remediation and baseline-report conditions; 10.2 MW remains design IT capacity.
Latest dated source: 17 Nov 2023. This is a source publication date, not the review or construction date.
Operating Crete facility launched in April 2025. Factsheet records 537 m² customer space, three fibre inputs and a 10 MVA connection; these remain separate from the 1 MW pre-opening expectation and 6.5 MW IT full-growth potential.
Review context
Operating Crete facility launched in April 2025. Factsheet records 537 m² customer space, three fibre inputs and a 10 MVA connection; these remain separate from the 1 MW pre-opening expectation and 6.5 MW IT full-growth potential.
Latest dated source: 9 Apr 2025. This is a source publication date, not the review or construction date.
Operating port-area facility at Porte 4, with documented building, façade, electrical BIM and office-fit-out teams. No site import rating has been established.
Review context
Operating port-area facility at Porte 4, with documented building, façade, electrical BIM and office-fit-out teams. No site import rating has been established.
Latest dated source: 19 Jan 2021. This is a source publication date, not the review or construction date.
Operating Zagreb colocation site at Selska cesta 93. CIX confirms an on-site exchange node and RETN lists a carrier presence. Original developer, registered title, import limit and project delivery appointments remain unverified.
Review context
Operating Zagreb colocation site at Selska cesta 93. CIX confirms an on-site exchange node and RETN lists a carrier presence. Original developer, registered title, import limit and project delivery appointments remain unverified.
Latest dated source: 3 Jun 2025. This is a source publication date, not the review or construction date.
15 MW IT expansion targeted for 2028. Campus heat-reuse context now records Energie Opfikon taking over Airport City contracts and a 2029 network target; this does not establish a ZUR4-specific heat obligation.
Review context
15 MW IT expansion targeted for 2028. Campus heat-reuse context now records Energie Opfikon taking over Airport City contracts and a 2029 network target; this does not establish a ZUR4-specific heat obligation.
Latest dated source: 27 Aug 2026. This is a source publication date, not the review or construction date.
Kemsley Paper Mill, Sittingbourne, Kent, United Kingdom
PITA's 7 September 2026 report describes a proposed PM4 closure alongside investment in PM6. This is a machine-level restructuring signal, not closure of the whole mill.
Review context
PITA's 7 September 2026 report describes a proposed PM4 closure alongside investment in PM6. This is a machine-level restructuring signal, not closure of the whole mill.
Next check: Reopen only on a primary land-release notice identifying a separable parcel and retained-operation interfaces. Do not treat the PM4 closure proposal as an available whole-site opportunity.
Announced second Arklow campus at Kish Business Park, approximately 5 km from DUB20. The developer confirms an initial 90 MW IT target. Ultimate expansion capacity and the proposed 110 kV connection require current planning and grid evidence.
Review context
Announced second Arklow campus at Kish Business Park, approximately 5 km from DUB20. The developer confirms an initial 90 MW IT target. Ultimate expansion capacity and the proposed 110 kV connection require current planning and grid evidence.
Latest dated source: 9 May 2025. This is a source publication date, not the review or construction date.
Construction on the former Kvarnsveden mill estate, with Mistral AI as an announced compute customer. The existing campus and later plan-673 expansion have different planning/programme scopes; no import allocation is inferred from the proposed 145 kV connections.
Review context
Construction on the former Kvarnsveden mill estate, with Mistral AI as an announced compute customer. The existing campus and later plan-673 expansion have different planning/programme scopes; no import allocation is inferred from the proposed 145 kV connections.
Latest dated source: 8 Jul 2026. This is a source publication date, not the review or construction date.
Specific permitted project at Koolhovenlaan 1. Distinct from Digital Realty/Interxion AMS11 at Koolhovenlaan 35–45. Newly surfaced historical planning research, not a newly announced project or an available off-market site; import capacity and delivery team remain unverified.
Review context
Specific permitted project at Koolhovenlaan 1. Distinct from Digital Realty/Interxion AMS11 at Koolhovenlaan 35–45. Newly surfaced historical planning research, not a newly announced project or an available off-market site; import capacity and delivery team remain unverified.
Latest dated source: 29 Jun 2026. This is a source publication date, not the review or construction date.
Operating Sofia facility at 33 Nedelcho Bonchev Street. Parcel and client are identified in the engineering portfolio; RETN confirms a site-specific carrier presence. Import rights, current planning files and construction-team scopes remain unresolved.
Review context
Operating Sofia facility at 33 Nedelcho Bonchev Street. Parcel and client are identified in the engineering portfolio; RETN confirms a site-specific carrier presence. Import rights, current planning files and construction-team scopes remain unresolved.
Latest dated source: 20 Jul 2023. This is a source publication date, not the review or construction date.