EngineNode Bracetown / Gunnocks campusIn planning

Bracetown and Gunnocks, County Meath, Ireland

Four-building proposal north of Clonee, distinct from Meta. Site clearance is evidenced by a named contractor. The related 220 kV design connects to the Corduff–Woodland line through two underground circuits; permission does not establish energisation or transferable import rights.

Review context

Four-building proposal north of Clonee, distinct from Meta. Site clearance is evidenced by a named contractor. The related 220 kV design connects to the Corduff–Woodland line through two underground circuits; permission does not establish energisation or transferable import rights.

Latest dated source: 5 Jul 2021. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB1 — CitywestOperating

Citywest, Dublin, Ireland

Colocation facility at Unit 4027 Kingswood Road, Citywest Business Campus. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services; Fiber Connect is also listed. No site-wide MW figure is established by the cited page.

Review context

Colocation facility at Unit 4027 Kingswood Road, Citywest Business Campus. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services; Fiber Connect is also listed. No site-wide MW figure is established by the cited page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB2 — ClondalkinOperating

Clondalkin, Dublin, Ireland

Colocation facility at Unit 7 Kilcarbery Business Park, New Nangor Road. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services; Fiber Connect is also listed. No site-wide MW figure is established by the cited page.

Review context

Colocation facility at Unit 7 Kilcarbery Business Park, New Nangor Road. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services; Fiber Connect is also listed. No site-wide MW figure is established by the cited page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB3 — BallycoolinOperating

Ballycoolin, Dublin, Ireland

Colocation facility at Unit 2 Northwest Business Park. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services. No site-wide MW figure is established by the cited page.

Review context

Colocation facility at Unit 2 Northwest Business Park. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services. No site-wide MW figure is established by the cited page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB4 — BallycoolinOperating

Ballycoolin, Dublin, Ireland

Colocation facility at Unit 14 Northwest Business Park. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services. No site-wide MW figure is established by the cited page.

Review context

Colocation facility at Unit 14 Northwest Business Park. The facility specifications list Equinix Internet Exchange, Metro Connect and cross-connect services. No site-wide MW figure is established by the cited page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB5x — SnugboroughOperating

Blanchardstown, Dublin, Ireland

Hyperscale xScale facility at IDA Business & Technology Park, Snugborough. Retained as a distinct operator-listed facility; no individual MW capacity or fibre-route specification is established by the cited sources.

Review context

Hyperscale xScale facility at IDA Business & Technology Park, Snugborough. Retained as a distinct operator-listed facility; no individual MW capacity or fibre-route specification is established by the cited sources.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB6x — SnugboroughOperating

Blanchardstown, Dublin, Ireland

Hyperscale xScale facility at IDA Business & Technology Park, Snugborough. Retained as a distinct operator-listed facility; no individual MW capacity or fibre-route specification is established by the cited sources.

Review context

Hyperscale xScale facility at IDA Business & Technology Park, Snugborough. Retained as a distinct operator-listed facility; no individual MW capacity or fibre-route specification is established by the cited sources.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Equinix DB7x — BlanchardstownUnder construction

Blanchardstown, Dublin, Ireland

New facility beside existing Equinix data centres. The operator says it will use power already allocated to its existing site; retail capacity is targeted for early 2028. That target is not treated as an opening confirmation.

Review context

New facility beside existing Equinix data centres. The operator says it will use power already allocated to its existing site; retail capacity is targeted for early 2028. That target is not treated as an opening confirmation.

Latest dated source: 20 Mar 2026. This is a source publication date, not the review or construction date.

Open full evidence
Google Dublin — operating DC1 / DC2 campusOperating

Profile Park / Grange Castle, Dublin, Ireland

Operating Google DC1/DC2 at Profile Park / Grange Castle, excluding the proposed DC3 expansion recorded separately. The June 2024 EIAR identifies two existing buildings under P1189-01.

Review context

Operating Google DC1/DC2 at Profile Park / Grange Castle, excluding the proposed DC3 expansion recorded separately. The June 2024 EIAR identifies two existing buildings under P1189-01.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Green Mountain LON-East campusOperating

Romford, London, United Kingdom

Former Infinity SDC campus. June 2026 update reports 7 MW historically operating and 14 MW recently delivered.

Review context

Former Infinity SDC campus. June 2026 update reports 7 MW historically operating and 14 MW recently delivered.

Latest dated source: 1 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
JCD EPark — DC1Under construction

Little Island, Cork, Ireland

86,000 sq ft first building. JCD describes EPark as a 100-acre development near Castleview substation. Historic T5 joint-venture descriptions do not establish the current operator.

Review context

86,000 sq ft first building. JCD describes EPark as a 100-acre development near Castleview substation. Historic T5 joint-venture descriptions do not establish the current operator.

Latest dated source: 23 Jun 2016. This is a source publication date, not the review or construction date.

Open full evidence
JCD EPark — DC2In planning

Little Island, Cork, Ireland

99,000 sq ft single-storey building. Gas capacity of 33 MWth is thermal and is excluded from the electrical figure.

Review context

99,000 sq ft single-storey building. Gas capacity of 33 MWth is thermal and is excluded from the electrical figure.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
JCD EPark — DC3In planning

Little Island, Cork, Ireland

323,000 sq ft two-storey proposal. Its pending capacity must not be added to DC1/DC2 as secured campus supply.

Review context

323,000 sq ft two-storey proposal. Its pending capacity must not be added to DC1/DC2 as secured campus supply.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
K2 Ballycoolin — North and South buildingsStage unconfirmed

Ballycoolin Business Park, Ballycoolin Road, Dublin 15, Ireland

Two-building regulatory site under FW19A/0089, amended by FW20A/0181 and FW21A/0092. The existing data centre to the east is excluded. No unverified mapping to K2 DUB1/DUB4/DUB5 is made.

Review context

Two-building regulatory site under FW19A/0089, amended by FW20A/0181 and FW21A/0092. The existing data centre to the east is excluded. No unverified mapping to K2 DUB1/DUB4/DUB5 is made.

Latest dated source: 20 Jan 2025. This is a source publication date, not the review or construction date.

Open full evidence
Kao Data Kenwood PointIn planning

Stockport, Greater Manchester, United Kingdom

Kenwood Point redevelopment; ongoing substation and cabling works precede construction of the data-centre buildings.

Review context

Kenwood Point redevelopment; ongoing substation and cabling works precede construction of the data-centre buildings.

Latest dated source: 1 Jul 2026. This is a source publication date, not the review or construction date.

Open full evidence
Keppel DC Dublin 1 — CitywestOperating

Citywest, Dublin, Ireland

Operating colocation facility at Citywest. The owner reports continuous technical support for clients. DMC publishes a specific retrofit/expansion appointment; that scope does not establish new capacity available to customers. Keppel describes the facility as carrier-neutral in a network-dense location.

Review context

Operating colocation facility at Citywest. The owner reports continuous technical support for clients. DMC publishes a specific retrofit/expansion appointment; that scope does not establish new capacity available to customers. Keppel describes the facility as carrier-neutral in a network-dense location.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Keppel DC Dublin 2 — BallycoolinOperating

Ballycoolin, Dublin, Ireland

Operating colocation facility at Ballycoolin. The owner reports continuous technical support for clients. DMC publishes a specific retrofit/expansion appointment; that scope does not establish new capacity available to customers. Keppel describes the facility as carrier-neutral in a network-dense location.

Review context

Operating colocation facility at Ballycoolin. The owner reports continuous technical support for clients. DMC publishes a specific retrofit/expansion appointment; that scope does not establish new capacity available to customers. Keppel describes the facility as carrier-neutral in a network-dense location.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Killala Business Park — MSN Partnership data centre sitePermitted

Killala, County Mayo, Ireland

Separate brownfield data centre consent within the former Asahi complex: conversion of a 12,000 m² warehouse, new 13,200 m² data centre and 725 m² networking building. DNG markets 6.3 hectares at price on application; no published IT or secured import capacity found.

Review context

Separate brownfield data centre consent within the former Asahi complex: conversion of a 12,000 m² warehouse, new 13,200 m² data centre and 725 m² networking building. DNG markets 6.3 hectares at price on application; no published IT or secured import capacity found.

Latest dated source: 22 Dec 2025. This is a source publication date, not the review or construction date.

Open full evidence
Microsoft Grange Castle campusOperating

Grange Castle, Dublin, Ireland

Operational Microsoft campus. KMM documents electrical works and names Winthrop and H&MV as contractors, without identifying the building or date. These relationships are recorded at campus level; land title and utility MVA remain unverified.

Review context

Operational Microsoft campus. KMM documents electrical works and names Winthrop and H&MV as contractors, without identifying the building or date. These relationships are recorded at campus level; land title and utility MVA remain unverified.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Microsoft Jigginstown proposalIn planning

Naas, County Kildare, Ireland

Proposed campus at Jigginstown near Naas. Public developer updates identify the location and design-stage surveys, but do not name the survey contractors or establish secured import capacity.

Review context

Proposed campus at Jigginstown near Naas. Public developer updates identify the location and design-stage surveys, but do not name the survey contractors or establish secured import capacity.

Latest dated source: 26 Jul 2024. This is a source publication date, not the review or construction date.

Open full evidence
NorthC Amsterdam 2 — former ColtOperating

Amsterdam Zuidoost, Netherlands

Stekkenbergweg 4 facility. Former Colt identity is retained as an alias, not a second project.

Review context

Stekkenbergweg 4 facility. Former Colt identity is retained as an alias, not a second project.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Tapella — Hoffmann Park data-centre conversionIn planning

Little Island, Cork, Ireland

Conversion of a former pharmaceutical building at Hoffmann Park, Inchera, separate from JCD EPark at the former Mitsui Denman site. Permission includes generators and an MV substation; no grid agreement or usable import capacity was verified. Later expansion remains a project ambition.

Review context

Conversion of a former pharmaceutical building at Hoffmann Park, Inchera, separate from JCD EPark at the former Mitsui Denman site. Permission includes generators and an MV substation; no grid agreement or usable import capacity was verified. Later expansion remains a project ambition.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Vantage DUB1 — DUB11 and DUB12Under construction

Profile Park, Grange Castle, Dublin, Ireland

Two-building first stage on a nine-hectare campus. The published 100MVA multi-fuel plant is on-site generation, not a firm grid-import allowance. DUB11 and DUB12 are consolidated to avoid campus/phase double counting. DUB13 is excluded from this record and its capacity.

Review context

Two-building first stage on a nine-hectare campus. The published 100MVA multi-fuel plant is on-site generation, not a firm grid-import allowance. DUB11 and DUB12 are consolidated to avoid campus/phase double counting. DUB13 is excluded from this record and its capacity.

Latest dated source: 29 Apr 2024. This is a source publication date, not the review or construction date.

Open full evidence
VNET Datapark 48 proposalIn planning

Bratislava, Slovakia

Proposed additional facility at VNET’s headquarters. Published room area and rack specifications do not establish MW.

Review context

Proposed additional facility at VNET’s headquarters. Published room area and rack specifications do not establish MW.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence

This feed combines the latest recorded project and land reviews with saved legacy record notes. It is not a complete field-by-field change history.