Recorded research reviews across data centres and land.

Demand & infrastructure signals
234 matching entries

A review is a research check, not a new project announcement. Open a record for its source evidence.

AVAIO Orion / Mayo Data Hub — KillalaPermission refused

Killala, County Mayo, Ireland

Refused data centre proposal on 10.58 hectares south of the former Asahi complex. Distinct from the earlier MSN Partnership warehouse conversion. Grid capacity and renewable supply evidence did not satisfy ACP.

Review context

Refused data centre proposal on 10.58 hectares south of the former Asahi complex. Distinct from the earlier MSN Partnership warehouse conversion. Grid capacity and renewable supply evidence did not satisfy ACP.

Latest dated source: 17 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
AWS Belgard / Airton — buildings A and BOperating

Junction of Belgard Road and Airton Road, Tallaght, Dublin 24, Ireland

Two-building installation at Belgard / Airton Road, distinct from Hibernian Greenhills. EPA P1173-01; planning SD16A/0093 and SD18A/0219. Utility voltage is not a capacity measure.

Review context

Two-building installation at Belgard / Airton Road, distinct from Hibernian Greenhills. EPA P1173-01; planning SD16A/0093 and SD18A/0219. Utility voltage is not a capacity measure.

Latest dated source: 17 Jul 2023. This is a source publication date, not the review or construction date.

Open full evidence
AWS Clonshaugh — buildings W, X and YOperating

Clonshaugh Business and Technology Park, Dublin 17, Ireland

Operating AWS buildings W/X/Y under P1186-01, excluding the separately identified U/V extension. Planning references for the existing drainage infrastructure are 2979/13, 2688/13 and 3534/11.

Review context

Operating AWS buildings W/X/Y under P1186-01, excluding the separately identified U/V extension. Planning references for the existing drainage infrastructure are 2979/13, 2688/13 and 3534/11.

Latest dated source: 11 Mar 2025. This is a source publication date, not the review or construction date.

Open full evidence
AWS Cruiserath — buildings E, F and GIn planning

Cruiserath Road, Dublin 15, Ireland

Three-building expansion of the existing AWS campus. EirGrid’s 27 May 2025 letter confirms a 240 MVA campus maximum import agreement with Amazon Data Services Ireland Limited, last modified 14 February 2025. This is not 240 MVA allocated to E/F/G, spare power or transferable capacity. Building-level import allocations remain unverified.

Review context

Three-building expansion of the existing AWS campus. EirGrid’s 27 May 2025 letter confirms a 240 MVA campus maximum import agreement with Amazon Data Services Ireland Limited, last modified 14 February 2025. This is not 240 MVA allocated to E/F/G, spare power or transferable capacity. Building-level import allocations remain unverified.

Latest dated source: 19 Dec 2025. This is a source publication date, not the review or construction date.

Open full evidence
AWS Drogheda — Building AOperating

Drogheda IDA Business and Technology Park, Donore Road, County Meath, Ireland

Building A only: council permission LB191735 granted 31 March 2020 and EPA P1181-01. The separate Building B record carries its own permission. Oldbridge 110 kV is shared site infrastructure.

Review context

Building A only: council permission LB191735 granted 31 March 2020 and EPA P1181-01. The separate Building B record carries its own permission. Oldbridge 110 kV is shared site infrastructure.

Latest dated source: 25 Sept 2025. This is a source publication date, not the review or construction date.

Open full evidence
AWS Drogheda — Building BIn planning

Drogheda IDA Business and Technology Park, Donore Road, County Meath, Ireland

Second building adjoining operating A. The 48 MW figure is assessed facility electricity demand, not IT load or proof of secured import. Later review application is not itself an operating licence.

Review context

Second building adjoining operating A. The 48 MW figure is assessed facility electricity demand, not IT load or proof of secured import. Later review application is not itself an operating licence.

Latest dated source: 25 Sept 2025. This is a source publication date, not the review or construction date.

Open full evidence
AWS Grange Castle South — A/B/C campusOperating

Grange Castle South Business Park, Baldonnel, Dublin 22, Ireland

Operating installation on a 16.5 ha site west of the Google campus; planning SD20A/0121 and EPA licence P1170-01. The 2023 programme retained later B/C phases. Published backup-generator thermal input is not grid demand or IT capacity.

Review context

Operating installation on a 16.5 ha site west of the Google campus; planning SD20A/0121 and EPA licence P1170-01. The 2023 programme retained later B/C phases. Published backup-generator thermal input is not grid demand or IT capacity.

Latest dated source: 15 Aug 2025. This is a source publication date, not the review or construction date.

Open full evidence
AWS Greenhills — Hibernian A–COperating

Hibernian Industrial Estate, Greenhills Road, Tallaght, Dublin 24, Ireland

Three-building 7.72 ha installation straddling Hibernian Industrial Estate Road. Distinct from the AWS Belgard/Airton and former Barrett’s Greenhills sites. Capacity and specific construction-team appointments were not established.

Review context

Three-building 7.72 ha installation straddling Hibernian Industrial Estate Road. Distinct from the AWS Belgard/Airton and former Barrett’s Greenhills sites. Capacity and specific construction-team appointments were not established.

Latest dated source: 14 Jun 2023. This is a source publication date, not the review or construction date.

Open full evidence
AWS Kildare Innovation Campus — B1 / DUB159Under construction

Kildare Innovation Campus, Barnhall Road, Leixlip, County Kildare, Ireland

B1 alone within KIC planning 23/60047 / PL09.318151. The wider four-data-centre campus is not all assigned to Amazon. Original EPA application rejection is distinct from a planning refusal.

Review context

B1 alone within KIC planning 23/60047 / PL09.318151. The wider four-data-centre campus is not all assigned to Amazon. Original EPA application rejection is distinct from a planning refusal.

Latest dated source: 17 Oct 2025. This is a source publication date, not the review or construction date.

Open full evidence
AWS Snugborough — buildings A–DOperating

Blanchardstown Industrial Park, Snugborough Road, Dublin 15, Ireland

Four-building installation, distinct from the AWS Cruiserath E/F/G expansion and nearby Equinix. EPA P1172-01 identifies the site. Public generator thermal ratings are not IT load or utility import capacity.

Review context

Four-building installation, distinct from the AWS Cruiserath E/F/G expansion and nearby Equinix. EPA P1172-01 identifies the site. Public generator thermal ratings are not IT load or utility import capacity.

Latest dated source: 14 Aug 2023. This is a source publication date, not the review or construction date.

Open full evidence
Blacknight — Carlow data centreOperating

Graiguecullen, Carlow, Ireland

Existing operator-owned development at Graiguecullen; legal freehold title remains unverified. Operator-wide connectivity and 2 MW-per-site marketing are not treated as independently verified Carlow MIC, IT capacity or spare headroom.

Review context

Existing operator-owned development at Graiguecullen; legal freehold title remains unverified. Operator-wide connectivity and 2 MW-per-site marketing are not treated as independently verified Carlow MIC, IT capacity or spare headroom.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
CloudCIX — Cork Internet eXchangeOperating

Hollyhill, Cork, Ireland

Existing commercial data centre at Hollyhill Industrial Estate, Cork, T23 R68N. HEAnet identifies an installed fibre node linking Cork and Dublin with onward European network services. Historic extension MW figures have not been treated as present spare power or parcel import capacity.

Review context

Existing commercial data centre at Hollyhill Industrial Estate, Cork, T23 R68N. HEAnet identifies an installed fibre node linking Cork and Dublin with onward European network services. Historic extension MW figures have not been treated as present spare power or parcel import capacity.

Latest dated source: 27 Jan 2026. This is a source publication date, not the review or construction date.

Open full evidence
Data4 Jawczyce — second buildingOperating

Jawczyce, Ożarów Mazowiecki, Poland

Newly opened Warsaw-region facility with documented modular construction and BREEAM Excellent certification.

Review context

Newly opened Warsaw-region facility with documented modular construction and BREEAM Excellent certification.

Latest dated source: 9 Apr 2026. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB1 — Park West — Lavery AvenueOperating

Park West, Dublin, Ireland

Current Digital Realty colocation facility at Unit 35 Lavery Avenue, Park West. The operator publishes DUB1 as a separate site; site-wide MW capacity is not established by the cited facility page. Its brochure advertises access to INEX, more than 45 carriers/ISPs and AWS/Azure cloud points of presence.

Review context

Current Digital Realty colocation facility at Unit 35 Lavery Avenue, Park West. The operator publishes DUB1 as a separate site; site-wide MW capacity is not established by the cited facility page. Its brochure advertises access to INEX, more than 45 carriers/ISPs and AWS/Azure cloud points of presence.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB10 — BlanchardstownOperating

Blanchardstown, Dublin, Ireland

Current Digital Realty colocation facility at Unit 9 Blanchardstown Corporate Park. The operator publishes DUB10 as a separate site; site-wide MW capacity is not established by the cited facility page.

Review context

Current Digital Realty colocation facility at Unit 9 Blanchardstown Corporate Park. The operator publishes DUB10 as a separate site; site-wide MW capacity is not established by the cited facility page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB11 — ClonshaughOperating

Clonshaugh, Dublin, Ireland

Current Digital Realty colocation facility at Clonshaugh Industrial Estate. The operator publishes DUB11 as a separate site; site-wide MW capacity is not established by the cited facility page.

Review context

Current Digital Realty colocation facility at Clonshaugh Industrial Estate. The operator publishes DUB11 as a separate site; site-wide MW capacity is not established by the cited facility page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB12 — ClonshaughOperating

Clonshaugh, Dublin, Ireland

Current Digital Realty colocation facility at Clonshaugh Industrial Estate. The operator publishes DUB12 as a separate site; site-wide MW capacity is not established by the cited facility page.

Review context

Current Digital Realty colocation facility at Clonshaugh Industrial Estate. The operator publishes DUB12 as a separate site; site-wide MW capacity is not established by the cited facility page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB13 — Profile Park 1Operating

Clondalkin, Dublin, Ireland

Current Digital Realty colocation facility at Profile Park 1, Kilcarbery. The operator publishes DUB13 as a separate site; site-wide MW capacity is not established by the cited facility page. The shared Profile Park factsheet states dual-entry fibre from two carrier routes and access to INEX; these are operator claims, not an independently surveyed route map.

Review context

Current Digital Realty colocation facility at Profile Park 1, Kilcarbery. The operator publishes DUB13 as a separate site; site-wide MW capacity is not established by the cited facility page. The shared Profile Park factsheet states dual-entry fibre from two carrier routes and access to INEX; these are operator claims, not an independently surveyed route map.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB14 — Profile Park 2Operating

Clondalkin, Dublin, Ireland

Current Digital Realty colocation facility at Profile Park 2, Kilcarbery. The operator publishes DUB14 as a separate site; site-wide MW capacity is not established by the cited facility page. The shared Profile Park factsheet states dual-entry fibre from two carrier routes and access to INEX; these are operator claims, not an independently surveyed route map.

Review context

Current Digital Realty colocation facility at Profile Park 2, Kilcarbery. The operator publishes DUB14 as a separate site; site-wide MW capacity is not established by the cited facility page. The shared Profile Park factsheet states dual-entry fibre from two carrier routes and access to INEX; these are operator claims, not an independently surveyed route map.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB2 — Park West — Hume AvenueOperating

Park West, Dublin, Ireland

Current Digital Realty colocation facility at Unit 24 Hume Avenue, Park West. The operator publishes DUB2 as a separate site; site-wide MW capacity is not established by the cited facility page.

Review context

Current Digital Realty colocation facility at Unit 24 Hume Avenue, Park West. The operator publishes DUB2 as a separate site; site-wide MW capacity is not established by the cited facility page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB3 — Grange CastleOperating

Clondalkin, Dublin, Ireland

Current Digital Realty colocation facility at Grange Castle Business Park, Nangor Road. The operator publishes DUB3 as a separate site; site-wide MW capacity is not established by the cited facility page.

Review context

Current Digital Realty colocation facility at Grange Castle Business Park, Nangor Road. The operator publishes DUB3 as a separate site; site-wide MW capacity is not established by the cited facility page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty DUB4 — Grange CastleOperating

Clondalkin, Dublin, Ireland

Current Digital Realty colocation facility at Grange Castle Business Park, Nangor Road. The operator publishes DUB4 as a separate site; site-wide MW capacity is not established by the cited facility page.

Review context

Current Digital Realty colocation facility at Grange Castle Business Park, Nangor Road. The operator publishes DUB4 as a separate site; site-wide MW capacity is not established by the cited facility page.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Digital Realty MRS5Under construction

Marseille, France

Port-site redevelopment of the former sugar silo. MRS5 remains distinct from the existing MRS4 record.

Review context

Port-site redevelopment of the former sugar silo. MRS5 remains distinct from the existing MRS4 record.

Latest dated source: 18 May 2026. This is a source publication date, not the review or construction date.

Open full evidence
Echelon / Kent Homes — Kilmeaden technology parkIn planning

Kilmeaden, Co. Waterford, Ireland

Planned data-centre and energy campus on the former Kilmeaden cheese-factory site, part of a 108.79 ha mixed-use scheme. The promoter claims proximity to grid and fibre and cites KLMDO1/KLMDO3 planning objectives. Published utility assertions are not a verified MIC, connection offer or available power entitlement.

Review context

Planned data-centre and energy campus on the former Kilmeaden cheese-factory site, part of a 108.79 ha mixed-use scheme. The promoter claims proximity to grid and fibre and cites KLMDO1/KLMDO3 planning objectives. Published utility assertions are not a verified MIC, connection offer or available power entitlement.

Latest dated source: 22 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
Echelon DUB10 — Clondalkin campusOperating

Clondalkin, Dublin, Ireland

Clondalkin campus with a 110kV grid substation and an energy centre. Designer Group identifies more than 90MW IT design capacity and 200MW on-site generation; these are different metrics. Individual phases are consolidated here to avoid counting the campus and its buildings twice.

Review context

Clondalkin campus with a 110kV grid substation and an energy centre. Designer Group identifies more than 90MW IT design capacity and 200MW on-site generation; these are different metrics. Individual phases are consolidated here to avoid counting the campus and its buildings twice.

Latest dated source: 17 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
Echelon DUB20 — ArklowUnder construction

Arklow, County Wicklow, Ireland

Campus under construction at the former Irish Fertiliser Industries site in Avoca River Business Park. Echelon confirms a 90 MW IT target. The 800 MW-plus offshore-wind scheme is generation, not campus import. Future expansion and on-site generation figures are excluded from verified capacity.

Review context

Campus under construction at the former Irish Fertiliser Industries site in Avoca River Business Park. Echelon confirms a 90 MW IT target. The 800 MW-plus offshore-wind scheme is generation, not campus import. Future expansion and on-site generation figures are excluded from verified capacity.

Latest dated source: 15 Sept 2026. This is a source publication date, not the review or construction date.

Open full evidence
Echelon DUB40 — Grange CastleUnder construction

Grange Castle, Dublin, Ireland

Grange Castle campus under construction. Historic design material identifies on-site generation and a planned 110kV connection. No firm import MVA is established; the historic consultant page contains ambiguous data-hall MW figures, so they are not promoted as campus capacity.

Review context

Grange Castle campus under construction. Historic design material identifies on-site generation and a planned 110kV connection. No firm import MVA is established; the historic consultant page contains ambiguous data-hall MW figures, so they are not promoted as campus capacity.

Latest dated source: 27 Apr 2022. This is a source publication date, not the review or construction date.

Open full evidence
EdgeConneX Dublin campusOperating

Dublin, Ireland

The operator describes a Dublin campus with two purpose-built data centres. Kept as one campus record because separately mapped phases and present commissioning boundaries are not established by the accessible primary evidence.

Review context

The operator describes a Dublin campus with two purpose-built data centres. Kept as one campus record because separately mapped phases and present commissioning boundaries are not established by the accessible primary evidence.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Eir — Patrick Street exchange conversionUnder construction

Drogheda, Co. Louth, Ireland

Conversion of 2,413 m² of the existing Patrick Street exchange, A92 H682, to data-centre use on a 0.6329 ha site, with backup generation and battery works. No public import-capacity figure or site-title verification was obtained.

Review context

Conversion of 2,413 m² of the existing Patrick Street exchange, A92 H682, to data-centre use on a 0.6329 ha site, with backup generation and battery works. No public import-capacity figure or site-title verification was obtained.

Latest dated source: Publication date not recorded. This is a source publication date, not the review or construction date.

Open full evidence
Energia Huntstown data-centre campusUnder construction

North Road, Finglas, Dublin 11, Ireland

Two-building scheme adjoining Huntstown Power Station. Energia confirms construction and names Microsoft as the end user in its FY2026 Q1 report (period ending 30 June 2025), page 15. Planning-team appointments do not establish later delivery appointments; title and general contractor remain unverified.

Review context

Two-building scheme adjoining Huntstown Power Station. Energia confirms construction and names Microsoft as the end user in its FY2026 Q1 report (period ending 30 June 2025), page 15. Planning-team appointments do not establish later delivery appointments; title and general contractor remain unverified.

Latest dated source: 18 Jun 2026. This is a source publication date, not the review or construction date.

Open full evidence

This feed combines the latest recorded project and land reviews with saved legacy record notes. It is not a complete field-by-field change history.