A score should explain a decision, not hide it.

Each record links to its source and states what remains unresolved. The current beta uses manual research and device-local working notes. Qualification requires independent evidence of control, power and a viable development route.

Suitability

An explained scenario assessment of five factors, issued only when its evidence gates pass.

Evidence confidence

A structured analyst judgement of completeness and source quality, not a probability.

Hard stops

Constraints that cannot be averaged away by stronger factors elsewhere.

Why this is not “just ask a chatbot.”

General-purpose AI can help discover and summarise. It does not, by itself, maintain a permissioned opportunity pipeline, resolve parcels and counterparties, preserve claim-level provenance, monitor changes or apply the same buyer mandate every time.

Structured records

The same fields, definitions and evidence classes across every market.

Version history

Dated research notes remain visible. Automated field history and conflict detection are future work.

Human decisions

Authority, material claims and disclosure scope require review.

Controlled access

Public research is accessible. Private customer workspaces and document permissions are future work.

Control and power are separate gates.

A named owner is not an available site. Record a specific parcel, a plausible bilateral route, current marketing checks, usable area, a planning route and customer demand. The power class records the maturity of a specific capacity claim. It does not establish acquisition readiness, contractual rights or transferable supply. Current records remain research or market intelligence until every gate is met.

Every power statement has a basis.

Observed means a dated quotation from a named public source. Derived means a calculation from observed inputs using an explicit rule. Unknown means the evidence is missing or does not establish the stated field. A plausible value is never used to close a gap.

The Ireland pilot extends the existing records. Other countries retain an unknown site-level power position until their evidence is reviewed. A source accessed today does not make its historical claim current.

Capacity ladder and class

Read applied, offered, accepted / contracted and energised MVA as four separate rungs. Every rung retains its claim date, site or phase boundary, source quotation and verification level. The class is derived from the highest rung supported at document seen or better. A conflicting claim remains visible with both sources and cannot silently replace another value.

A
Accepted / contracted or energised

A site-specific accepted, contracted or energised import-capacity rung is supported at document seen or better. Public evidence still does not prove the present contract, retained rights or transferability.

B
Offer evidenced

A site-specific import-capacity offer is supported at document seen or better. Acceptance, satisfaction of conditions and energisation remain separate questions.

C
Application evidenced

A site-specific import-capacity application is supported at document seen or better. An application establishes neither an offer nor capacity allocation.

D
No qualifying ladder evidence

No application, offer, accepted / contracted or energised import-capacity rung meets document seen or better. Proximity, a source count and marketing claims cannot raise the class.

IT load, facility load and import capacity are separate. MW is not converted to MVA without observed conversion inputs. A 200 MW IT campus claim and an 83.5 MVA application can describe different electrical boundaries or phases. They are retained as an unresolved scope comparison until documents establish the relationship.

What the verification levels require

LevelRequired evidence
Self-declaredA named developer, owner or other interested party states the claim. Repetition in press coverage does not independently confirm it.
Document seenA reviewed source document directly records the specific ladder event, amount and site or phase. A planning document that repeats an applicant’s power claim remains self-declared for that claim. Seeing a document is not proof of a current contractual right.
Independently corroboratedIndependent evidence confirms the same material claim, capacity boundary and event. Two articles relying on the same press release are one provenance chain.
Third-party confirmedA competent network operator or other authoritative party directly confirms the particular event and capacity. A register entry is assessed for the fact it actually records, without implying contract access or transfer rights.

Publisher quality and claim provenance are distinct. An official document can record a self-declared applicant statement. Publication date, event date and access date are stored separately. Where a date is not stated, it stays unknown.

Derived energisation window

The window is a scenario range, never a promised connection date. Start with the evidenced ladder event date plus the operator’s published time remaining from that same stage. Set the earliest bound to the latest of the supported process minimum, every required reinforcement’s earliest completion, grid-works planning availability and any dated policy prerequisites. Set the latest bound to the latest of the supported process maximum and those dependencies’ supported upper bounds.

All binding dependencies must be accounted for. Missing stage dates, an inapplicable process duration, unconfirmed reinforcement, pending planning or unmet policy conditions leave the affected bound open. A one-sided result is shown only when its assumptions are explicit. With no defensible bound, earliest and latest remain unknown. The model does not invent a two-year, five-year or other allowance for an unknown.

Each result displays the actual inputs, the rule, the dependencies that drive it and what would have to be true for the earliest case. An operator’s decision or application-processing duration is not treated as a construction or energisation duration. An observed historic energisation event is not a derived future delivery window.

Indicative HV and connection capex

Country reference rows retain voltage, configuration, currency, price base year, low and high values, unit, inclusions, exclusions, source and source date. Eligible categories include a shared substation bay, a new 110 kV or 132 kV substation, a 220 kV or 275 kV GIS substation, underground and overhead routes per kilometre, and a switching station. A reference is populated only from a published index or report that supports that category and price basis.

For a complete published scope, the indicative low and high totals are the sum of each observed quantity multiplied by the matching reference low and high rate. Every component and input is shown. Different currencies, price bases, configurations or scopes are not added without a sourced adjustment rule. Straight-line distance is not route length. No inflation, exchange rate, contingency or owner’s cost is assumed.

If the published scope or an eligible reference is missing, the complete connection capex band remains unknown. Partial benchmarks may be shown as context with their exclusions; they cannot be labelled a total site connection budget. Scope questions identify the information needed next.

Policy, alternatives and open questions

Behind-the-meter generation, battery storage, private wire and gas retain their own evidence and planning or policy status. Their ratings are never treated as site import capacity. Policy exposure states the operative rule, effective date, whether it applies to this connection and the observed condition that appears inconsistent. Uncertain applicability remains a question, rather than a finding of non-compliance.

Open questions are generated from the unknown fields, incomplete window inputs, missing capex scope and unresolved conflicts. They form the document request and specialist-check list for a Power Reality Check. None of the public research establishes contractual rights or a proven energisation date.

Country sources and refresh cadence

Country files record each source, what it can establish, its scheduled review frequency and the actual last check. A planned cadence is not evidence that an automated review ran. Check policy again before any paid assessment and whenever a new decision is published; check every site-critical source again when issuing an opinion.

CountryCoverage stageSources and cadence
IrelandFive-record pilot firstEirGrid demand publications, transmission development and adequacy reports; ESB Networks capacity maps; CRU connection policy; planning authority and An Coimisiún Pleanála infrastructure decisions. Entry-level schedules and last checks appear below.
United KingdomContext only until site pilot completesNESO connection registers and reform gates; the relevant DNO’s capacity heatmap. Site-specific evidence must establish the node and applicable queue position.
SpainContext only until site pilot completesREE access capacity by node, distribution operator capacity maps and national network planning. Published headroom alone does not establish access rights.
PolandContext only until site pilot completesPSE and relevant DSO connection conditions, application information and refusals. Published figures require their date and demand or generation boundary.
NetherlandsContext only until site pilot completesTenneT and Netbeheer Nederland congestion information. A mapped location does not establish a site connection offer.
DenmarkContext only until site pilot completesEnerginet connection status and the applicable March 2026 pause documentation. The exact scope and subsequent changes must be checked before applying it to a site.
IrelandIreland pilot · 15 source entries
CRU/2025236: Large Energy Users Connection Policy decisionCommission for Regulation of Utilities · Source checked

Connection policy for new data centre applications, including matching dispatchable generation or storage, additional renewable electricity and network location assessment. At least 80% of annual demand must be met by additional renewable electricity generated in the Republic of Ireland, with a six-year glide path from energisation. Requirements and transitional scope must be checked against the actual application date and connection position.

A policy requirement is not evidence that a particular site has complied or has connection rights. Onsite or proximate generation is permitted; onsite-only generation is not a universal requirement. Do not retrospectively apply the new application rules to an earlier agreement without checking transitional scope. No fixed publisher update cadence is stated; PowerPlotr proposes a weekly policy check.

Commission for Regulation of Utilities: CRU/2025236: Large Energy Users Connection Policy decisionPublished 12 December 2025 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Data Centre Connection Offer Process and Policy, Version 3EirGrid · Source checked

Implements CRU/2025236. For new transmission data centres at or above 10 MVA, nominated dispatchable generation or storage must match MIC after applicable de-rating and be delivered before energisation or demand ramp-up. Nominated generation is separately connected and metered and participates in the SEM. The stated offer-processing periods are approximately 7.5 calendar months where nominated generation and renewables already have offers, or up to 18 months where associated generation has newly applied through ECP-GSS.

These are conditional application-to-offer periods, not construction or energisation durations, and are excluded from energisation calculations. A complete application, linked generation status and fees matter. An offer is not an accepted agreement. Earlier applications can remain under CRU/21/124. Publisher updates are event-driven; proposed review is weekly.

EirGrid: Data Centre Connection Offer Process and Policy, Version 3Published 20 May 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Data Centre Technical AssessmentEirGrid · Source checked

Explains application-specific assessment of capacity, voltage, system stability, short-circuit effects and outages. Continuous demand above 50 MW is significant for the Irish 110 kV network and should focus on connection voltages above 110 kV. Dedicated loop-in connections are difficult to integrate and require wider system benefit.

General technical context cannot establish a connection point, headroom or capacity allocation for a particular site. Every proposal still requires operator assessment. Publisher cadence is event-driven; proposed review is monthly and after a related policy decision.

EirGrid: Data Centre Technical AssessmentPublished 20 May 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Data Centre Constrained Area OverviewEirGrid · Source checked

Pages 11 to 12 identify high-level potential on the 220 kV network around Galway, Limerick and Cork, subject to individual assessment and policy compliance. The overview considers greater Dublin fully constrained for new data centre development. It advises a prudent mid-2030s assumption for new connections in the identified areas because of work and outage programmes.

Regional opportunity is not site-specific capacity or a contractual right. Mid-2030s is qualitative operator context, not a bounded energisation window or a promised 2035 date. Earlier applications and agreements require their own transitional-policy check. Detailed heat maps are planned through the 2027 Ten Year Transmission Forecast Statement. No recurring publisher cadence is specified; proposed review is monthly.

EirGrid: Data Centre Constrained Area OverviewPublished 20 May 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
CRU2026145: Grid Code Modification MPID 345 and Compliance and Derogation FrameworkCommission for Regulation of Utilities · Source checked

Approves fault ride-through, rate of change of frequency and active power recovery requirements for existing and future transmission-connected demand facilities. The technical requirements include remaining connected within the specified voltage profile, withstanding plus or minus 1 Hz/s and recovering 90% of pre-fault active power within 500 milliseconds after fault clearance and voltage recovery to 0.9 per unit. Compliance is assessed at the point of connection.

The associated Grid Code amendment takes effect on 27 October 2026. This is a separate technical requirement from the December 2025 connection policy. Site compliance, an approved derogation and any demand utilisation restriction need direct evidence. Missing public compliance evidence means unverified, not automatically non-compliant. Publisher updates are event-driven; proposed review is weekly.

Commission for Regulation of Utilities: CRU2026145: Grid Code Modification MPID 345 and Compliance and Derogation FrameworkPublished 22 September 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
MPID 345 CRU approval letter and effective dateCommission for Regulation of Utilities, hosted by EirGrid · Source checked

The CRU directs EirGrid to amend the Grid Code five weeks after the 22 September 2026 decision. EirGrid's Grid Code Modifications register labels this approval effective 27 October 2026. The letter applies the technical requirements to all transmission-connected demand facilities.

The effective date does not itself prove compliance or an energisation entitlement at any site. Review the decision, current Grid Code and any approved derogation together. Publisher cadence is event-driven; proposed review is weekly through implementation.

Commission for Regulation of Utilities, hosted by EirGrid: MPID 345 CRU approval letter and effective datePublished 22 September 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Availability Capacity Heatmap and customer download, July 2026ESB Networks · Source checked

Indicates available transformer capacity for demand and generation at distribution substations. The download is labelled July 2026, but station capacity and demand contracts and offers are dated to Q4 2025, with 2024/2025 load readings. The publisher's stated objective is quarterly map updates. PowerPlotr proposes a monthly check for a replacement file and records the underlying data date separately from its label.

Transformer headroom is not guaranteed upstream network capacity, a connection offer, or site rights. HV locations are indicative. ESB's 6 to 9 month minor-works and approximately 2 to 3 year significant-station-work examples concern MV connections up to 10 MVA under stated conditions; they are not valid timing inputs for large transmission-connected pilots.

ESB Networks: Availability Capacity Heatmap and customer download, July 2026Published Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Distribution Network Development Plan and Demand Capacity Headroom Report 2025ESB Networks · Source checked

The DNDP identifies distribution investment and flexibility needs. Its Demand Capacity Headroom Report 2025 provides indicative headroom at existing 110 kV and 38 kV substations under four growth scenarios, with annual forecasts to 2030 and five-year intervals to 2050. The publisher says capacity workbooks update annually and network development plans every two years. Proposed PowerPlotr review is monthly.

Workbook headroom does not establish upstream feeder or transmission capacity, final site connections or rights. Future headroom can depend on planned reinforcement; verify the specific project's delivery and consent status. The checked landing page identifies and explains the workbooks; workbook cells have not been imported into the pilot.

ESB Networks: Distribution Network Development Plan and Demand Capacity Headroom Report 2025Published Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Transmission Development Plan 2024 and regulatory publications registerEirGrid · Source checked

The checked regulatory publication register lists Transmission Development Plan 2024, the 2024 Ten-Year Transmission Forecast Statement and current adequacy publications. This is the discovery and version-control entry for the earlier published development plan while the 2026 to 2035 draft is under CRU consultation.

A listed project is not evidence that it supplies a particular site, has all consents, or guarantees a delivery date. No reinforcement dependency has been assigned to a pilot merely from geographic proximity. The statutory development-plan cycle is two years; PowerPlotr proposes monthly checks for a new approved version or delivery update.

EirGrid: Transmission Development Plan 2024 and regulatory publications registerPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Draft Transmission Development Plan 2026 to 2035, CRU consultationCommission for Regulation of Utilities and EirGrid · Source checked

Consultation opened 7 October 2026 and is scheduled to close 20 November 2026. The linked draft is dated June 2026 and describes planned transmission works, contracted customer connections and indicative delivery timeframes. Development plans are published on a two-year cycle. Proposed PowerPlotr review is weekly during consultation and on publication of the final version.

This is a draft under consultation as at the access date. Do not label it final or treat its project dates as a site connection commitment. A named reinforcement must be matched to published site-specific connection scope before it becomes an energisation dependency.

Commission for Regulation of Utilities and EirGrid: Draft Transmission Development Plan 2026 to 2035, CRU consultationPublished 7 October 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
All-Island Resource Adequacy Assessment 2026 to 2035EirGrid and SONI · Source checked

The current adequacy publication assesses demand and generation over 2026 to 2035. It provides the successor resource-adequacy context to older Generation Capacity Statements, together with its main report, workbook, methodology and country assumptions. The main report's data-centre forecast considers projects already connected or with signed connection agreements at its study freeze date.

System adequacy is distinct from local connection headroom. The forecast is not a live site-level connection register and cannot establish a particular site's contracted or energised capacity. Publication and data-freeze dates differ. PowerPlotr proposes a monthly check for the next assessment, corrections or updated inputs; no fixed publication day is assumed.

EirGrid and SONI: All-Island Resource Adequacy Assessment 2026 to 2035Published Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
An Coimisiún Pleanála case search and strategic infrastructure casesAn Coimisiún Pleanála · Source checked

Official search for appeals, direct strategic infrastructure applications and related cases, including grid works. The current authority is An Coimisiún Pleanála, formerly An Bord Pleanála. Search by case reference, location, applicant and infrastructure to match a site with grid planning decisions and conditions. Proposed review is weekly and whenever a relevant case changes.

A grid planning application, pre-application consultation or permission does not establish an executed connection agreement, import capacity, route rights or energisation. Check the actual decision documents and exact development boundary. A target decision date is not the decision. The portal has no guaranteed fixed case-update interval.

An Coimisiún Pleanála: An Coimisiún Pleanála case search and strategic infrastructure casesPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
An Coimisiún Pleanála weekly listsAn Coimisiún Pleanála · Source checked

Weekly lists support monitoring of new cases and decisions. They are a discovery source for grid infrastructure and associated generation that may affect a site. Publisher cadence and proposed PowerPlotr review are weekly.

A list entry must be followed to the case and underlying documents before becoming a site-level power statement. Discovery of a nearby infrastructure project is not evidence of a connection dependency or capacity entitlement.

An Coimisiún Pleanála: An Coimisiún Pleanála weekly listsPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Strategic Infrastructure Development and pre-application consultationsAn Coimisiún Pleanála · Source checked

Explains direct strategic infrastructure applications and the pre-application consultation process, with separate guidance for applicants, planning authorities and the public. It is a route for discovering early grid and generation proposals before a final application or decision. Proposed review is monthly and on procedural change.

Public awareness of a pre-application consultation is not participation in that consultation, a permission, or a grid reservation. The existence of a consultation does not establish that a project will proceed. No fixed publisher refresh interval is stated.

An Coimisiún Pleanála: Strategic Infrastructure Development and pre-application consultationsPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Local Government Online Planning and local authority planning registersLocal Government Management Agency and local planning authorities · Source checked

Official portal for local authority planning applications. Use the specific authority register and case documents to establish published substation, cable, generation, storage and site planning scope. Proposed review is weekly for active pilot cases and when new documents are lodged.

Portal coverage and historical files vary by authority, so the original authority record remains necessary. Applicant statements remain applicant evidence unless independently corroborated. Planning does not prove a connection offer or agreement, and an indicative equipment rating is not contracted import capacity. No common publisher refresh interval is stated.

Local Government Management Agency and local planning authorities: Local Government Online Planning and local authority planning registersPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation

Published connection cost references

Ireland: published reference bands and missing configurations
ConfigurationVoltageType / unitLowHighCurrencyPrice baseUse and source
110 to 150 kV, 1 circuit110 / 132 / 150 kVoverhead
per km
570,000910,000EURUnknownContext only
110 to 150 kV, 2 circuits110 / 132 / 150 kVoverhead
per km
300,000390,000EURUnknownContext only
220 kV, 1 circuit220 kVoverhead
per km
320,000510,000EURUnknownContext only
220 kV, 2 circuits220 kVoverhead
per km
440,000740,000EURUnknownContext only
110 to 150 kV, 1 circuit110 / 132 / 150 kVunderground
per km
560,0001,590,000EURUnknownContext only
110 to 150 kV, 2 circuits110 / 132 / 150 kVunderground
per km
1,330,0003,580,000EURUnknownContext only
220 kV, 1 circuit220 kVunderground
per km
1,030,0002,400,000EURUnknownContext only
220 kV, 2 circuits220 kVunderground
per km
2,990,0004,690,000EURUnknownContext only
New GIS station, 0 to 5 bays, all reported voltage classes kVstation
per item
5,480,00015,110,000EURUnknownContext only
New GIS station, 6 to 9 bays, all reported voltage classes kVstation
per item
8,540,00012,600,000EURUnknownContext only
New AIS line bay in existing 110 kV single busbar outdoor station110 kVbay
per item
763,440763,440EUR2026Context only
630 square millimetre aluminium XLPE, single circuit, exactly one kilometre110 kVunderground
per km
398,640398,640EUR2026Context only
Outdoor 110/38 kV, one 31.5 MVA transformer and 38 kV bay and two-bay busbar extension110 kVstation
per item
1,504,2101,504,210EUR2026Context only
Outdoor 110/38 kV, one 63 MVA transformer and 38 kV bay and two-bay busbar extension110 kVstation
per item
1,826,8501,826,850EUR2026Context only
Complete shared substation bay connection in Ireland110 / 220 kVUnknown: A published AIS electrical bay component does not establish civils, shared allocation or a complete connection cost.
Scope questions
  • Which bay type, voltage, scope and cost-sharing arrangement apply?
  • What civils, protection, remote-end and reinforcement works are chargeable?
No eligible reference
Complete new 110 kV substation in Ireland110 kVUnknown: The ESB Networks 2026 whole-station types are discontinued; current transformer components exclude civil works.
Scope questions
  • What busbar arrangement, bay count, transformers, buildings and site works are published?
  • Is an Irish report or tender award available for the same scope and price base?
No eligible reference
New 132 kV substation132 kVUnknown: No Irish same-scope published cost band established; the voltage is a UK comparison requirement.
Scope questions
  • Which jurisdiction and operator standard apply?
  • What published construction reference matches the configuration?
No eligible reference
Complete new 220 kV or 275 kV GIS substation220 / 275 kVUnknown: The EU GIS comparison is grouped by bays, without a voltage-specific matched Irish band.
Scope questions
  • What GIS busbar design, bays, transformer scope and import arrangement are required?
  • Which published cost source matches voltage, geography, scope and price base?
No eligible reference
Complete switching station110 / 220 kVUnknown: No matched complete Irish public construction band verified.
Scope questions
  • What voltage, circuit topology, bay count, civils and protection scope apply?
  • Are published total costs separated from unrelated reinforcement?
No eligible reference
Reference scope, exclusions and price basis
EU comparator: 110 to 150 kV, 1 circuit overhead routeContext only · EUR · Price base unknown

570,000 to 910,000 EUR per km · 110 to 150 kV, 1 circuit · 110 / 132 / 150 kV · overhead

ACER Table I.1, page 43. Published 25th to 75th percentiles, 6 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 110 to 150 kV, 2 circuits overhead routeContext only · EUR · Price base unknown

300,000 to 390,000 EUR per km · 110 to 150 kV, 2 circuits · 110 / 132 / 150 kV · overhead

ACER Table I.1, page 43. Published 25th to 75th percentiles, 8 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 220 kV, 1 circuit overhead routeContext only · EUR · Price base unknown

320,000 to 510,000 EUR per km · 220 kV, 1 circuit · 220 kV · overhead

ACER Table I.1, page 43. Published 25th to 75th percentiles, 15 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 220 kV, 2 circuits overhead routeContext only · EUR · Price base unknown

440,000 to 740,000 EUR per km · 220 kV, 2 circuits · 220 kV · overhead

ACER Table I.1, page 43. Published 25th to 75th percentiles, 25 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 110 to 150 kV, 1 circuit underground routeContext only · EUR · Price base unknown

560,000 to 1,590,000 EUR per km · 110 to 150 kV, 1 circuit · 110 / 132 / 150 kV · underground

ACER Table I.1, page 43. Published 25th to 75th percentiles, 20 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 110 to 150 kV, 2 circuits underground routeContext only · EUR · Price base unknown

1,330,000 to 3,580,000 EUR per km · 110 to 150 kV, 2 circuits · 110 / 132 / 150 kV · underground

ACER Table I.1, page 43. Published 25th to 75th percentiles, 7 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 220 kV, 1 circuit underground routeContext only · EUR · Price base unknown

1,030,000 to 2,400,000 EUR per km · 220 kV, 1 circuit · 220 kV · underground

ACER Table I.1, page 43. Published 25th to 75th percentiles, 20 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: 220 kV, 2 circuits underground routeContext only · EUR · Price base unknown

2,990,000 to 4,690,000 EUR per km · 220 kV, 2 circuits · 220 kV · underground

ACER Table I.1, page 43. Published 25th to 75th percentiles, 9 assets; EU sample, not an Irish construction index.

Fees: inclusion unknown.

Exclusions
  • Historical commissioned routes exceeding 5 kilometres; application to shorter connections is unverified.
  • Single monetary base year not explicitly established. No escalation, currency conversion or country adjustment applied.
  • Fees, customer allocation and project-specific scope are unverified. No complete site estimate may use this reference.
EU comparator: new GIS station with 0 to 5 bays, voltage unspecifiedContext only · EUR · Price base unknown

5,480,000 to 15,110,000 EUR per item · New GIS station, 0 to 5 bays, all reported voltage classes · kV · station

ACER Table I.2, page 44. Published 25th to 75th percentiles, 13 assets.

Fees: inclusion unknown.

Exclusions
  • Voltage-specific and Irish applicability unverified. This is not a 220 kV or 275 kV station band.
  • Single monetary base year not explicitly established.
  • Transformer scope and fees unverified. No complete site estimate may use this reference.
EU comparator: new GIS station with 6 to 9 bays, voltage unspecifiedContext only · EUR · Price base unknown

8,540,000 to 12,600,000 EUR per item · New GIS station, 6 to 9 bays, all reported voltage classes · kV · station

ACER Table I.2, page 44. Published 25th to 75th percentiles, 24 assets.

Fees: inclusion unknown.

Exclusions
  • Voltage-specific and Irish applicability unverified. This is not a 220 kV or 275 kV station band.
  • Single monetary base year not explicitly established.
  • Transformer scope and fees unverified. No complete site estimate may use this reference.
110 kV AIS line bay electrical componentContext only · EUR · 2026 price base

763,440 to 763,440 EUR per item · New AIS line bay in existing 110 kV single busbar outdoor station · 110 kV · bay

Item 35, pages 30 to 31. Electrical component including design and commissioning. Excluding VAT.

Fees: not included.

Exclusions
  • Generator standard charge, not a complete demand connection construction price.
  • Civils and remote-end works excluded; existing space, services and protection assumed adequate.
  • Shared customer contribution, land, access and site-specific reinforcement unknown.
110 kV underground cable electrical component for one kilometreContext only · EUR · 2026 price base

398,640 to 398,640 EUR per km · 630 square millimetre aluminium XLPE, single circuit, exactly one kilometre · 110 kV · underground

Item 8, pages 12 to 13. Generator cable charge for one kilometre only. Excluding VAT.

Fees: not included.

Exclusions
  • For more than one kilometre, ESB Networks states specific tender and pass-through charging apply.
  • Excavation, ducting, reinstatement and other civil works excluded.
  • Not an all-in construction cost or a scalable multi-kilometre rate.
110/38 kV, 31.5 MVA transformer electrical packageContext only · EUR · 2026 price base

1,504,210 to 1,504,210 EUR per item · Outdoor 110/38 kV, one 31.5 MVA transformer and 38 kV bay and two-bay busbar extension · 110 kV · station

Item 19, page 16. Electrical transformer package including design and commissioning. Excluding VAT.

Fees: not included.

Exclusions
  • Generator standard charge; not a complete new 110 kV substation cost.
  • Civil works excluded. Incoming connection, land, remote works and project allocation remain unknown.
110/38 kV, 63 MVA transformer electrical packageContext only · EUR · 2026 price base

1,826,850 to 1,826,850 EUR per item · Outdoor 110/38 kV, one 63 MVA transformer and 38 kV bay and two-bay busbar extension · 110 kV · station

Item 18, page 15. Electrical transformer package including design and commissioning. Excluding VAT.

Fees: not included.

Exclusions
  • Generator standard charge; not a complete new 110 kV substation cost.
  • Civil works excluded. Incoming connection, land, remote works and project allocation remain unknown.
United KingdomPrepared context; site research staged · 6 source entries
Connections reports and registersNational Energy System Operator (NESO) · Source checked

Official directory of connection registers and the Transmission Works Report. NESO states that its connection registers are published twice weekly. The works report identifies reinforcement schemes intended to facilitate connections.

Great Britain only. The TEC register concerns transmission entry capacity and must not be presented as a complete demand or data-centre import-capacity register. A listing does not establish a site's import agreement, conditions or energisation. Northern Ireland source coverage remains to be established.

National Energy System Operator (NESO): Connections reports and registersPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 3 daysRead the source quotation
Connections Reform design documents and methodologiesNational Energy System Operator (NESO) · Source checked

Dated source library for Gate 2 Criteria, Connections Network Design and Project Designation methodologies, approved versions, consultations and subsequent correspondence. Use the applicable version and its Ofgem decision when checking a claim about reform gates.

A consultation, draft or submission to Ofgem is not proof of an effective rule. Direct transmission demand and distribution demand require separate scope checks. No individual site's Gate 2 allocation, accepted offer or delivery date has been checked in this source-registry stage. Publisher update interval is not stated; seven days is PowerPlotr's review target.

National Energy System Operator (NESO): Connections Reform design documents and methodologiesPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
NESO implements electricity grid connection reforms to unlock investment in Great BritainNational Energy System Operator (NESO) · Source checked

Operator announcement of the reformed delivery pipeline, including transmission-connected demand, with links to results and methodology. Establishes that infrastructure delivery and planning remain necessary after queue reform.

A national pipeline announcement is not evidence that a named site's agreement has been accepted or that its connection date is achievable. Later methodologies and site-specific offers must be checked. This is a dated announcement; seven days is a target to check for subsequent updates.

National Energy System Operator (NESO): NESO implements electricity grid connection reforms to unlock investment in Great BritainPublished 8 December 2025 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Network Opportunity and Development MapNational Grid Electricity Distribution (NGED) · Source checked

Landing-page description distinguishes connected and contracted network headroom and Network Development Plan constraints and solutions at the relevant substation levels. Provides demand and generation views.

Landing page and methodology description checked; interactive map data require registration and were not extracted. Headroom is indicative, future Grid Supply Point locations may be representative, and a colour is not a capacity reservation. Covers NGED's licence areas, not the whole UK. Publisher refresh interval not established; thirty days is PowerPlotr's review target.

National Grid Electricity Distribution (NGED): Network Opportunity and Development MapPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Network Scenario Headroom Report (NSHR) demand heatmapUK Power Networks · Source checked

Official demand-heatmap landing page within UK Power Networks' open data portal. The portal links the Network Development Plan, Long Term Development Statement, infrastructure map and large-demand dashboard.

The retrieved page requires login to view datasets. No headroom value, dataset version or individual project entry was available for verification. Scenario headroom is not an offer. Covers UK Power Networks' licence areas only. Dataset refresh interval not established; thirty days is PowerPlotr's review target.

UK Power Networks: Network Scenario Headroom Report (NSHR) demand heatmapPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Generation Availability and Network CapacitySSEN Distribution · Discovery only

Discovery lead for SSEN's generation availability, contracted-demand maps and headroom resources. Search-indexed descriptions identify network capability and substation information.

Direct retrieval returned HTTP 403. Current dataset version, live map content, demand values and publisher refresh interval remain unverified. Do not use indexed historical versions as current headroom. Thirty days is a proposed retry cadence.

SSEN Distribution: Generation Availability and Network CapacityPublished Unknown · Accessed 19 October 2026 · Last checked Unknown · Review every 30 days

This entry identifies a source to review. Its contents have not been verified for a site assessment.

Published connection cost references

No eligible published capex reference has been recorded. Country bands remain unknown.

SpainPrepared context; site research staged · 6 source entries
Conoce la capacidad de acceso: consumidorRed Eléctrica · Source checked

Explains the transmission-demand access-capacity methodology, nodal and zonal constraints, security criteria, and treatment of power-electronic demand and synchronous compensation. These are demand sources and must be kept separate from generation access maps.

Published nodal capacity is a scenario-based network assessment, not a reservation for a site. Where synchronous compensation is included, the source requires its permissions, commissioning and effective operation. Applicable network and demand characteristics need site-specific study. Publisher update interval not established; thirty days is PowerPlotr's review target.

Red Eléctrica: Conoce la capacidad de acceso: consumidorPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Consulta el estado de las solicitudes: consumidorRed Eléctrica · Source checked

Official entry point for transmission-demand application and access-permit status and lists of qualifying demand applications. Use the relevant node and version when comparing applied and granted demand.

No named non-Irish site entry has been extracted in this preparation stage. An application, access permit and executed connection agreement are different evidence stages. Distribution applications need the relevant DSO source. Publisher update interval not established; seven days is PowerPlotr's review target.

Red Eléctrica: Consulta el estado de las solicitudes: consumidorPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Mapa de Capacidad de Consumoi-DE, Grupo Iberdrola · Source checked

Demand-capacity map and interpretation guidance for i-DE nodes above 1 kV. The operator states a minimum monthly update cadence and explains conditional nodes, possible reinforcement, transmission acceptability and the applicable distribution demand methodology.

Map values are informative and cannot be added across nodes or voltage levels. A site-specific study can refuse an application. A node marked 0* has no capacity in the published scenario and may require applicant-funded reinforcement. No individual node value was extracted for this registry.

i-DE, Grupo Iberdrola: Mapa de Capacidad de ConsumoPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Capacidades de acceso firme de la demanda en nodos de rede-distribución Redes Digitales · Source checked

Demand-capacity page for firm access at nodes above 1 kV, with downloadable dated files for e-distribución, EASA and Ceuta. The publisher states monthly updates using the preceding month's data. The authoritative values are the XLSX and CSV files.

Available firm-demand access is not an accepted site agreement. Capacities are not additive or simultaneous and upstream constraints need separate checks. The map was reported unavailable on the page. No dated file or site node has been selected here. Thirty days is PowerPlotr's review target.

e-distribución Redes Digitales: Capacidades de acceso firme de la demanda en nodos de redPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Planificación de redes en España: planificación nacionalRed Eléctrica · Source checked

Official national-planning entry point linking the planning process and amendments, including the July 2026 amendment. Use the approved plan and relevant project documents to identify proposed reinforcement dependencies.

Plan inclusion is not evidence that infrastructure has consent, is funded, is complete or serves a named site. A proposed planning horizon must not be described as approved without its decision. Publisher update interval not stated; thirty days is PowerPlotr's review target.

Red Eléctrica: Planificación de redes en España: planificación nacionalPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Third amendment to the 2021 to 2026 Electricity Transmission Network Development PlanMinisterio para la Transición Ecológica y el Reto Demográfico (MITECO) · Source checked

Government notice confirms approval of the third targeted amendment of the 2021 to 2026 transmission plan. It provides national reinforcement context and a link to the announcement document.

The national amendment announcement is not a site connection approval, construction programme or capex rate card. Identify the exact reinforcement and its permissions before using a date. Thirty days is a target for checking later amendments, not a publisher schedule.

Ministerio para la Transición Ecológica y el Reto Demográfico (MITECO): Third amendment to the 2021 to 2026 Electricity Transmission Network Development PlanPublished 28 July 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation

Published connection cost references

No eligible published capex reference has been recorded. Country bands remain unknown.

PolandPrepared context; site research staged · 5 source entries
Wykaz obiektów planowanych do przyłączenia do sieci przesyłowejPolskie Sieci Elektroenergetyczne (PSE) · Source checked

Official directory of transmission connection applications, conditions and refusals, substations without connection capability, common procedures and aggregate TSO/DSO information. PSE states these statutory disclosures are updated at least monthly.

Application, issued conditions, executed agreement and commencement of supply are separate stages. A published condition does not prove an agreement remains valid or its securities have been met. No non-Irish record has been populated from this register.

Polskie Sieci Elektroenergetyczne (PSE): Wykaz obiektów planowanych do przyłączenia do sieci przesyłowejPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Connection disclosures under Article 7(8l), position at 31 August 2026Polskie Sieci Elektroenergetyczne (PSE) · Source checked

Dated position snapshot linked by PSE's current disclosure directory. The PDF separately records import and export MW, connection location, voltage, project stage, application, conditions, refusal, agreement and supply-start dates where populated.

31 August 2026 is the stated data-position date, not a verified publication date. Empty cells remain unknown. The current directory should be checked for a replacement snapshot before using values in an assessment. A historical row cannot prove current contractual rights or available network headroom.

Polskie Sieci Elektroenergetyczne (PSE): Connection disclosures under Article 7(8l), position at 31 August 2026Published Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Podmioty ubiegające się o przyłączenieTAURON Dystrybucja · Source checked

Official DSO directory for applicants above 1 kV, linking a disclosure of planned connections and refusals labelled 31 August 2026. Provides a representative regional source alongside PSE.

Landing page and dated-file listing checked; individual file rows have not been reviewed. TAURON's territory is not the whole Polish distribution network. Publisher refresh interval not independently established here; thirty days is PowerPlotr's review target.

TAURON Dystrybucja: Podmioty ubiegające się o przyłączeniePublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Przyłączenie do sieci: pytania i odpowiedziTAURON Dystrybucja · Source checked

Official connection-process guidance includes deadlines and exclusions for issuing connection conditions. Useful for checking which administrative step a reported programme actually describes.

Time allowed to issue conditions is not time to energisation. No construction-duration input has been adopted. Applicable customer group, complete application and current legislation must be checked. Publisher update interval not established; thirty days is PowerPlotr's review target.

TAURON Dystrybucja: Przyłączenie do sieci: pytania i odpowiedziPublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Informacje o przyłączeniachEnea Operator · Discovery only

Discovery lead for the DSO's statutory application, conditions and refusal disclosures above 1 kV.

Official-domain result was located but direct retrieval failed with HTTP 502. Current canonical URL, file date, completeness and live disclosure content remain unverified. Do not use this entry as site evidence. Thirty days is a proposed retry cadence.

Enea Operator: Informacje o przyłączeniachPublished Unknown · Accessed 19 October 2026 · Last checked Unknown · Review every 30 days

This entry identifies a source to review. Its contents have not been verified for a site assessment.

Published connection cost references

No eligible published capex reference has been recorded. Country bands remain unknown.

NetherlandsPrepared context; site research staged · 3 source entries
Capaciteitskaart elektriciteitsnet: regionale netbeheerders, afnameNetbeheer Nederland and participating network operators · Source checked

Official regional-network demand map provides distinct capacity and queue-status categories and links to the TenneT and combined views. Demand (afname) must be assessed separately from export (teruglevering).

Map shell and legend verified. The interactive data layer reported an error, so no postcode, substation capacity, queue value or reinforcement date was captured. Regional colour alone cannot establish available site import or a contractual right. Publisher cadence is documented separately in the map-methodology entry.

Netbeheer Nederland and participating network operators: Capaciteitskaart elektriciteitsnet: regionale netbeheerders, afnamePublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Capaciteitskaart elektriciteitsnet: TenneT, afnameTenneT via Netbeheer Nederland · Source checked

Official TenneT transmission-demand layer of the national capacity map. The separate TSO layer allows upstream congestion to be checked alongside a regional DSO view.

Layer URL and legend verified; map data reported an error and no area-specific conclusion was taken. An upstream network constraint must not be inferred solely from a DSO colour. No site allocation or connection date is established. Publisher cadence is documented separately in the map-methodology entry.

TenneT via Netbeheer Nederland: Capaciteitskaart elektriciteitsnet: TenneT, afnamePublished Unknown · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation
Capacity-map update: planned grid extensions and the transmission networkNetbeheer Nederland · Source checked

Explains combined, TenneT and regional layers; postcode lookup; planned reinforcement and target commissioning dates. States capacity information is renewed at least quarterly, more often for material developments, and queue information monthly.

The map does not disclose individual company applications. Planned reinforcement dates are target dates, not site energisation commitments. This dated methodology should be checked for later changes; thirty days is PowerPlotr's review target.

Netbeheer Nederland: Capacity-map update: planned grid extensions and the transmission networkPublished 11 November 2024 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 30 daysRead the source quotation

Published connection cost references

No eligible published capex reference has been recorded. Country bands remain unknown.

DenmarkPrepared context; site research staged · 4 source entries
Energinet introduces a temporary pause in new connection agreementsEnerginet, official press release via Via Ritzau · Source checked

Historical operator notice paused new transmission connection agreements and lengthened screening and maturation processing. It explicitly excludes projects with an already concluded connection agreement. The initial period was three months or until an overview and additional measures were in place.

This was not a blanket cancellation of all Danish grid connections. Read with the May transition notice and October update below. It cannot establish the treatment of any particular site, DSO application or agreement. Seven days is PowerPlotr's target to check subsequent notices.

Energinet, official press release via Via Ritzau: Energinet introduces a temporary pause in new connection agreementsPublished 2 March 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
New model for larger connections and agreements after the temporary pauseEnerginet, official press release via Via Ritzau · Source checked

Operator notice says the initial pause ends after 3 June, with larger projects moving to pooled assessment using maturity, progress and network-friendly criteria. New agreements were not expected before autumn. Smaller and medium DSO customers could continue connecting in many places; larger DSO requests needed upstream clarification.

October's later notice gives the next stated allocation milestone. No site-specific capacity, execution date or energisation window is established. The general discussion of five to ten years for some very large connections is not a universal process duration and has not been adopted as a site-model input. Seven days is a review target.

Energinet, official press release via Via Ritzau: New model for larger connections and agreements after the temporary pausePublished 27 May 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Regulator approval of Energinet customer maturity and progress requirementsEnerginet, official press release via Via Ritzau · Source checked

Latest operator status checked before the assessment date. Energinet reports regulator approval of maturity and progress criteria and expects the first pooled capacity allocation in November 2026. The release links the regulator's decision.

A planned November allocation is not an award, signed connection agreement or energisation. Individual capacity and agreement status remain unknown without project evidence. The legal text linked from the release was not readable in this retrieval; see the discovery entry. Seven days is PowerPlotr's review target, not a fixed operator publication cadence.

Energinet, official press release via Via Ritzau: Regulator approval of Energinet customer maturity and progress requirementsPublished 16 October 2026 · Accessed 19 October 2026 · Last checked 19 October 2026 · Review every 7 daysRead the source quotation
Forsyningstilsynet decision linked by Energinet on 16 October 2026Forsyningstilsynet · Discovery only

Official decision endpoint linked by Energinet's October status notice. Retained for legal-text review before assigning any site-level policy-compliance conclusion.

Endpoint returned no readable decision text. Exact decision date, conditions, effective scope and exceptions have not been independently checked. Do not treat the operator's summary as a reviewed legal determination for a named site. Seven days is a proposed retry cadence.

Forsyningstilsynet: Forsyningstilsynet decision linked by Energinet on 16 October 2026Published Unknown · Accessed 19 October 2026 · Last checked Unknown · Review every 7 days

This entry identifies a source to review. Its contents have not been verified for a site assessment.

Published connection cost references

No eligible published capex reference has been recorded. Country bands remain unknown.

Source quotations and access log (38)
  1. Energy infrastructure unit investment cost (UIC) indicators, 2026Agency for the Cooperation of Energy Regulators (ACER) · Published 24 April 2026 · Accessed 19 October 2026
    Meur/km
    Meur/asset
  2. Standard Prices for Generator Connections 2026, revision 16, effective 1 January 2026ESB Networks DAC · Published 2026 · Accessed 19 October 2026
    Standard Charge
  3. CRU/2025236: Large Energy Users Connection Policy decisionCommission for Regulation of Utilities · Published 12 December 2025 · Accessed 19 October 2026
    Large Energy Users Connection Policy
  4. Data Centre Connection Offer Process and Policy, Version 3EirGrid · Published 20 May 2026 · Accessed 19 October 2026
    a data centre application cannot be progressed if it is in a constrained area
  5. Data Centre Technical AssessmentEirGrid · Published 20 May 2026 · Accessed 19 October 2026
    will need to focus on connection voltages above 110 kV
  6. Data Centre Constrained Area OverviewEirGrid · Published 20 May 2026 · Accessed 19 October 2026
    New capacity is not secured until a connection agreement contract is executed.
  7. CRU2026145: Grid Code Modification MPID 345 and Compliance and Derogation FrameworkCommission for Regulation of Utilities · Published 22 September 2026 · Accessed 19 October 2026
    both currently connected and future connections
  8. MPID 345 CRU approval letter and effective dateCommission for Regulation of Utilities, hosted by EirGrid · Published 22 September 2026 · Accessed 19 October 2026
    The Grid Code will be deemed to be amended five weeks from the date of this decision letter.
  9. Availability Capacity Heatmap and customer download, July 2026ESB Networks · Published Unknown · Accessed 19 October 2026
    The map indicates transformer capacity only.
  10. Distribution Network Development Plan and Demand Capacity Headroom Report 2025ESB Networks · Published Unknown · Accessed 19 October 2026
    the information provided is indicative
  11. Transmission Development Plan 2024 and regulatory publications registerEirGrid · Published Unknown · Accessed 19 October 2026
    Transmission Development Plan 2024
  12. Draft Transmission Development Plan 2026 to 2035, CRU consultationCommission for Regulation of Utilities and EirGrid · Published 7 October 2026 · Accessed 19 October 2026
    The CRU has published a consultation on the Draft Transmission Development Plan 2026-2035.
  13. All-Island Resource Adequacy Assessment 2026 to 2035EirGrid and SONI · Published Unknown · Accessed 19 October 2026
    a comprehensive analysis of how demand and generation could evolve
  14. An Coimisiún Pleanála case search and strategic infrastructure casesAn Coimisiún Pleanála · Published Unknown · Accessed 19 October 2026
    Case search
  15. An Coimisiún Pleanála weekly listsAn Coimisiún Pleanála · Published Unknown · Accessed 19 October 2026
    Weekly Lists
  16. Strategic Infrastructure Development and pre-application consultationsAn Coimisiún Pleanála · Published Unknown · Accessed 19 October 2026
    The public are informed about pre-application consultations but cannot take part in the consultations.
  17. Local Government Online Planning and local authority planning registersLocal Government Management Agency and local planning authorities · Published Unknown · Accessed 19 October 2026
    Planning System
  18. Connections reports and registersNational Energy System Operator (NESO) · Published Unknown · Accessed 19 October 2026
    These registers are published twice weekly and show the latest contracted position.
  19. Connections Reform design documents and methodologiesNational Energy System Operator (NESO) · Published Unknown · Accessed 19 October 2026
    We are required under our licence to keep our Connections Methodologies under regular review.
  20. NESO implements electricity grid connection reforms to unlock investment in Great BritainNational Energy System Operator (NESO) · Published 8 December 2025 · Accessed 19 October 2026
    Thousands of kms of new electricity lines and cables are required
  21. Network Opportunity and Development MapNational Grid Electricity Distribution (NGED) · Published Unknown · Accessed 19 October 2026
    guide users through our existing and contracted network headroom
  22. Network Scenario Headroom Report (NSHR) demand heatmapUK Power Networks · Published Unknown · Accessed 19 October 2026
    PLEASE LOGIN TO VIEW DATASETS
  23. Conoce la capacidad de acceso: consumidorRed Eléctrica · Published Unknown · Accessed 19 October 2026
    Red Eléctrica realiza estudios específicos para determinar la capacidad de acceso de las instalaciones de demanda
  24. Consulta el estado de las solicitudes: consumidorRed Eléctrica · Published Unknown · Accessed 19 October 2026
    estado de permisos y solicitudes de acceso y conexión de demanda a la red de transporte
  25. Mapa de Capacidad de Consumoi-DE, Grupo Iberdrola · Published Unknown · Accessed 19 October 2026
    La información contenida en el mapa de capacidad se actualizará con una periodicidad mínima mensual
  26. Capacidades de acceso firme de la demanda en nodos de rede-distribución Redes Digitales · Published Unknown · Accessed 19 October 2026
    La información se actualiza mensualmente, con datos del mes anterior.
  27. Planificación de redes en España: planificación nacionalRed Eléctrica · Published Unknown · Accessed 19 October 2026
    Aprobadas las modificaciones de aspectos puntuales en julio de 2026.
  28. Third amendment to the 2021 to 2026 Electricity Transmission Network Development PlanMinisterio para la Transición Ecológica y el Reto Demográfico (MITECO) · Published 28 July 2026 · Accessed 19 October 2026
    ha aprobado la tercera Modificación de aspectos puntuales del Plan
  29. Wykaz obiektów planowanych do przyłączenia do sieci przesyłowejPolskie Sieci Elektroenergetyczne (PSE) · Published Unknown · Accessed 19 October 2026
    będą aktualizowane co najmniej raz na miesiąc
  30. Connection disclosures under Article 7(8l), position at 31 August 2026Polskie Sieci Elektroenergetyczne (PSE) · Published Unknown · Accessed 19 October 2026
    Data zawarcia umowy o przyłączenie
  31. Podmioty ubiegające się o przyłączenieTAURON Dystrybucja · Published Unknown · Accessed 19 October 2026
    Informacja o przyłączanych obiektach i wydanych odmowach
  32. Przyłączenie do sieci: pytania i odpowiedziTAURON Dystrybucja · Published Unknown · Accessed 19 October 2026
    terminów na wydanie warunków przyłączenia do sieci
  33. Capaciteitskaart elektriciteitsnet: regionale netbeheerders, afnameNetbeheer Nederland and participating network operators · Published Unknown · Accessed 19 October 2026
    Tekort aan transportcapaciteit met wachtrij
  34. Capaciteitskaart elektriciteitsnet: TenneT, afnameTenneT via Netbeheer Nederland · Published Unknown · Accessed 19 October 2026
    Gebied is in onderzoek met wachtrij
  35. Capacity-map update: planned grid extensions and the transmission networkNetbeheer Nederland · Published 11 November 2024 · Accessed 19 October 2026
    De informatie over de wachtrij wordt maandelijks bijgewerkt.
  36. Energinet introduces a temporary pause in new connection agreementsEnerginet, official press release via Via Ritzau · Published 2 March 2026 · Accessed 19 October 2026
    Projekter med allerede indgået nettilslutningsaftale påvirkes ikke.
  37. New model for larger connections and agreements after the temporary pauseEnerginet, official press release via Via Ritzau · Published 27 May 2026 · Accessed 19 October 2026
    Projekter behandles samlet i puljer i stedet for enkeltvis
  38. Regulator approval of Energinet customer maturity and progress requirementsEnerginet, official press release via Via Ritzau · Published 16 October 2026 · Accessed 19 October 2026
    til november for første gang uddeler en pulje af kapacitet

Read European grid positions with confidence.

The planned half-day online Masterclass works through capacity ladders, conflicting power claims, policy exposure, energisation dependencies and connection capex evidence. €1,500 per seat or €12,000 per firm, excluding VAT.

Dates and bookings are not yet open. Register interest to hear when a session is available.

View the syllabus and register interest

Five factors, with evidence first

Model scenario-fit-v1. Each sourced analyst rating is 0–4; its weighted contribution is rating ÷ 4 × weight. A missing rating stays unknown.

Power30%

Scoped import evidence, deliverability, time to power and connection dependencies.

Land20%

Development control, usable footprint, access and evidenced acquisition constraints.

Fibre15%

Site handoff, contractual access and physical route evidence, including unresolved diversity.

Planning20%

Parcel zoning, permission, conditions, appeals and environmental constraints.

Demand15%

Workload, geography and delivery-window evidence. Allocated capacity is not an open requirement.

Demand evidence is separate from an available requirement.

The intelligence register separates confirmed observations, probable interpretations, estimates, rumours and unknowns. Confidence describes the observation, not the chance that a development happens. Allocated contracts, unresolved remaining demand and paused plans retain their own commercial status.

Signals are grouped by an evidenced company, campus or location relationship. A campus connection does not transfer a tenant or capacity figure to another building. Event dates, source dates and actual research review dates remain separate.

Explore demand and infrastructure signals

Do not confuse “found” with “for sale.”

Origin, market exposure, verification and cloud-region alignment answer different questions. They remain visible on every dossier.

ORIGINReverse originated · Owner submitted · Agent submitted · Public comparable

How the record entered the pipeline.

EXPOSURENot verified · Unmarketed · Privately available · Selectively marketed · Publicly marketed

What is known about its current market posture.

VERIFICATIONSelf-declared · Document seen · Independently corroborated · Third-party confirmed

The highest present support for the material claim.

AZ-MARKET ALIGNMENTEstablished cloud-region market · Adjacent to established AZ market · No established AZ market

A region-level screen using provider-published locations. Exact availability-zone facility boundaries are not public, so parcel inclusion remains unverified unless directly evidenced.

From signal to a defensible lead

  1. 01
    Detect

    Identify closure, planning, grid, land and infrastructure signals.

  2. 02
    Resolve

    Establish the parcel, ownership route and actual developable area.

  3. 03
    Verify

    Separate confirmed facts from inference and close the critical gaps.

  4. 04
    Rank

    Assess a stated scenario only after the evidence gates pass; expose unresolved trade-offs.