Published capacity22 MW ITPublished claimBarcelona PLZF IT capacity in MERLIN's June 2026 company presentation. July results state repowering delivered; not a grid import limit or proof of spare capacity.
Barcelona PLZF IT capacity in MERLIN's June 2026 company presentation. July results state repowering delivered; not a grid import limit or proof of spare capacity.
16 MW IT · Legacy conflicting operator field Second critical-load field still on the live page; superseded scope is not explained. Not additive to 22 MW and not spare capacity. Conflicting published claim
Legacy conflicting operator field: Second critical-load field still on the live page; superseded scope is not explained. Not additive to 22 MW and not spare capacity.
Published capacity144 MW ITPublished claimSelected single-building development design; not built capacity.
Selected single-building development design; not built capacity.
227.4 MW unspecified · Authority-reported access-permit power Aragón government power statement linked to María and Los Vientos substations. Original permits, import basis, holder, conditions and transferability not inspected; distinct from 144 MW IT. Published claim
Published capacity14 MW unspecifiedPublished claimTotal planned BCN1 capacity in the opening announcement; IT versus utility basis and commissioned amount are not specified.
Total planned BCN1 capacity in the opening announcement; IT versus utility basis and commissioned amount are not specified.
15 MW IT · Historical lead-designer figure B-Global BCN1 design load; the May 2026 opening release states 14 MW total planned capacity without its electrical basis. Scope difference remains unresolved; not additive. Published claim
Published capacity22.3 MW ITPublished claimCombined operating ADC1 and ADC2 capacity stated by Nabiax; not ADC3 or the potential full-campus expansion.
Combined operating ADC1 and ADC2 capacity stated by Nabiax; not ADC3 or the potential full-campus expansion.
35 MW IT · Unreconciled cooling-contractor campus figure ENGIE's February 2026 cooling article uses 35 MW IT for the campus; it is not evidence that additional ADC1/ADC2 load is commissioned. Nabiax's phase-specific 22.3 MW remains the main figure. Published claim