ATH3 fully equipped IT design stated by ELEMKA; not metered load, contracted grid import, or proof that all IT capacity is occupied.
ATH3 fully equipped IT design stated by ELEMKA; not metered load, contracted grid import, or proof that all IT capacity is occupied.
6.8 MW unspecified · Historical annual-report design figure
The 2021 annual report, p. 103, describes a 2 February 2022 appointment and 6.8 MW without an IT/import basis, with phase one then expected in December 2022. Not additive to or a conversion of ELEMKA's later 8 MW IT fully equipped design.
Published claim