Published capacity33 MW ITPublished claimOperational SIN01 figure in Jacobs' undated current case study. The inauguration release reported 26 MW; expansion/scope reconciliation remains required.
Operational SIN01 figure in Jacobs' undated current case study. The inauguration release reported 26 MW; expansion/scope reconciliation remains required.
26 MW unspecified · Inauguration figure April 2025 inauguration release facility figure; electrical basis and reconciliation with Jacobs' current 33 MW IT are unresolved. Published claim
15 MW IT · Original NEST screening design Historical SIN01/NEST design recorded in APA's July 2023 opinion; not current operating capacity or an additive phase. Published claim
Published capacity5.1 MW unspecifiedPublished claimLIS001 power figure on the current operator page; IT versus utility basis is unstated. Excludes planned LIS002/LIS003 and does not establish spare supply.
LIS001 power figure on the current operator page; IT versus utility basis is unstated. Excludes planned LIS002/LIS003 and does not establish spare supply.
10 MVA · Operator-stated LIS001 power provision Undated LIS001 factsheet total power provision. No executed utility agreement, rights holder or available transferable import verified; not a conversion of the separate 5.1 MW figure. Published claim
Published capacity180 MW ITPublished claimSIN02 design figure stated by Start Campus in May 2025 and by Gleeds on its current phase-specific project page. It is not an import entitlement or disclosed leased load.
SIN02 design figure stated by Start Campus in May 2025 and by Gleeds on its current phase-specific project page. It is not an import entitlement or disclosed leased load.
200 MW unspecified · Current investment and programme figure Second-building figure in the May 2026 Nscale and Start Campus releases. The electrical basis is not stated and it is not disclosed leased load. Published claim
120 MW IT · Historical AIA design Per-building maximum for SIN02–SIN06 assessed in APA's 2023 environmental process; not current capacity or an import right. Published claim
240 MW IT · Historical developer upper scope August 2024 Start Campus description of each SIN02–SIN06 building as up to 240 MW IT. Later phase-specific sources state 180 MW IT and 200 MW unspecified; the scopes remain unresolved and are not additive. Published claim