Data centres

European projects, capacity and delivery teams.

Explore land research
Map viewPortugal

4 projects in Portugal4 with viability evidence

MERLIN Edged Lisbon — VFX first development phase

Vila Franca de Xira, Lisbon region·Portugal

Developer MERLIN Properties / Edged Energy

Under constructionStage source 28 Jul 2026
Published capacity80 MW ITPublished claim
Lisbon component of MERLIN’s Phase II IT development programme; excludes later VFX03–05 expansion.

Lisbon component of MERLIN’s Phase II IT development programme; excludes later VFX03–05 expansion.

7/10 evidence categories7 sources·2 team entries

SINES Data Campus — SIN01

Sines·Portugal

Developer Start Campus

OperatingStage source 4 Apr 2025
Published capacity33 MW ITPublished claim
Operational SIN01 figure in Jacobs' undated current case study. The inauguration release reported 26 MW; expansion/scope reconciliation remains required.

Operational SIN01 figure in Jacobs' undated current case study. The inauguration release reported 26 MW; expansion/scope reconciliation remains required.

26 MW unspecified · Inauguration figure
April 2025 inauguration release facility figure; electrical basis and reconciliation with Jacobs' current 33 MW IT are unresolved.
Published claim

15 MW IT · Original NEST screening design
Historical SIN01/NEST design recorded in APA's July 2023 opinion; not current operating capacity or an additive phase.
Published claim

10/10 evidence categories6 sources·6 team entries

AtlasEdge Lisbon campus — LIS001 and planned expansion

Carnaxide, Oeiras·Portugal

Developer AtlasEdge

OperatingStage date not published
Published capacity5.1 MW unspecifiedPublished claim
LIS001 power figure on the current operator page; IT versus utility basis is unstated. Excludes planned LIS002/LIS003 and does not establish spare supply.

LIS001 power figure on the current operator page; IT versus utility basis is unstated. Excludes planned LIS002/LIS003 and does not establish spare supply.

Capacity source

10 MVA · Operator-stated LIS001 power provision
Undated LIS001 factsheet total power provision. No executed utility agreement, rights holder or available transferable import verified; not a conversion of the separate 5.1 MW figure.
Published claim

7/10 evidence categories4 sources·3 team entries

SINES Data Campus — SIN02

Sines·Portugal

Developer Start Campus

Under constructionStage date not published
Published capacity180 MW ITPublished claim
SIN02 design figure stated by Start Campus in May 2025 and by Gleeds on its current phase-specific project page. It is not an import entitlement or disclosed leased load.

SIN02 design figure stated by Start Campus in May 2025 and by Gleeds on its current phase-specific project page. It is not an import entitlement or disclosed leased load.

200 MW unspecified · Current investment and programme figure
Second-building figure in the May 2026 Nscale and Start Campus releases. The electrical basis is not stated and it is not disclosed leased load.
Published claim

120 MW IT · Historical AIA design
Per-building maximum for SIN02–SIN06 assessed in APA's 2023 environmental process; not current capacity or an import right.
Published claim

240 MW IT · Historical developer upper scope
August 2024 Start Campus description of each SIN02–SIN06 building as up to 240 MW IT. Later phase-specific sources state 180 MW IT and 200 MW unspecified; the scopes remain unresolved and are not additive.
Published claim

10/10 evidence categories15 sources·4 team entries